Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | ||
|---|---|---|---|---|---|---|
|
|
Special Remarks:
The remaining 2 OBs can be executed any time, but on two different nights.
Abstract for MTS:
This is a FLAMES/COMMED7 programme on RVs of planet host candidates in 3 different fields: Field10, Field7B and FieldALT8B.
The OBs must be executed on the dates specified by the user. While Field10 has no
specific phase requirement (but specific dates have still to be used), the other two
fields have to be observed at specific phases (0.25 and 0.75). There is one OB for
each of the tow phases.
See the readme for the UT dates.
The OBs should be executed ideally between May 20 and June 5. If needed, the PI has given further dates for the next window.
**************
IMPORTANT NOTE (ADDED on 11/07/2006): the remaining two OBs (FIELD10-EXTRA1 and EXTRA2) can be executed at any time but only one OB per night.
**************
README of this run:
Web version of approved README readme_77066608.html