Last update of this page: Mon Jul 21 15:41:40 2008
Run State: TERMINATED/EP_TOO
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | |
|---|---|---|---|---|---|
|
Special Remarks:
NO REMARKS
Abstract for MTS:
ToO programme for LSS spectroscopy of SN candidates with FORS1. Targets will be triggered from CFHT observations carried out by the proposers at periods detailed in the README. The follow-up spectroscopy in this run is ro be observed as near as possible to the moment of maximum luminosity, but within the dark/gray period. A waiver has been granted to this programme to allow an OB duration longer than 1 hour, with the usual understanding that OBs will not be repeated if conditions degrade beyond thos requested after the 1 hour mark.
README of this run:
Web version of approved README readme_71048604.html