166A0701B.html |
RA Range:13
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 0.6 CLR 1.8 1 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
J-K imaging of a 2x2 mosaic field around a X-ray cluster (continuation of P66 large program). At least one OB of each sequence should be done under PHOT No standards provided. Calibration plan is required
README of this run: