165H0464D.html |
RA Range: ToO
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance): 2.0, THK, 5.0, 1.0, 30
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
ToO program on GRBs in order to determine the redshift distribution of GRBs, to study the nature of the host galaxy, to establish the nature of the GRB-SN connection and to perform the first ever follow-up observations of the subclass of short-duration GRBs. This is just one of 7 runs with 7 different instruments. Part of the time allocated to UVES (5 hours) can be used for the host galaxy follow-up part. Support History mr 18.4.00: finally submits notification letter F. Comeron, 16-Mar-2001: New OBs submitted for period 67. User asked to change the acquisition template (using dic1) for the dic2 OBs. Status kept as OK in case the OBs are needed at short notice. F. Comeron, 22-Mar-2001: Problem fixed, program certified. F.Primas, 16-Aug-01: 3 new OBs submitted for P68. OK.
README of this run: