079.D-0804A


Patat/ Benetti/ Cappellaro/ Mazzali/ Pastorello/ Turatto

FORS1

Last update of this page: Thu Jan 29 15:41:33 2009


Run State: TERMINATED/NS

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Time
Critical

Special Remarks:
Try to executed at least one or two SPEC OBs.

Abstract for MTS:
This is a FORS1-IMG/LSS programme on a faint Type Ia SN (V~21). NOTE (added on 20/06/2007): the PI asks to execute at least one or two SPEC OBs. At this point he is also ready to accept violations to the constraints. There are 5 LSS OBs and 1 IMG OB. Observations can be started any time during one of the dark times of April, May or June. Ideally, once the first OB is executed, the remaining five OBs should be executed within 7-10 days. If this cannot be done, the PI as ready to accept having the OBs a bit more spread in time. The imaging OB (SN2006X_IMG) should be executed right after or right before one of the SN2006X_SPEC_x OBs, but this is not a very strong requirement. Note that the PI asks to obtain specphot standard star observations both without the order sorting filter (as foreseen by the Calibration Plan for the science setup) and WITH GG435. He asks to do this whenever this is possible. He is aware that this will be done on a best effort basis. Observations will be more efficient if OBs are executed in pairs.


Run status page 079.D-0804A

README of this run:

Web version of approved README readme_79080400.html