Last update of this page: Thu Jan 29 15:41:33 2009
Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | |
|---|---|---|---|---|---|
|
Special Remarks:
WARNING: excessively long calibration times due to non-standard read-out 200kHz,1x1,low
Abstract for MTS:
Spectropolarimetric programme measuring circular polarization in Cyg X-1.
TIME CRITICAL INFORMATION: The six OBs should be executed on six consecutive nights. If observations on some nights are not possible due to bad weather conditions, then the remaining OBs should be observed randomly during the following weeks.
WARNING: The calibration times for the day-time are extremely long. Minimum requirement from the PI is to have 1 flat and wavelength exposures, but the observatory policy for P79 should be followed and the full calibration plan (i.e. 5 flats) executed. Perhaps the calibrations could be spread over more than one day.
README of this run:
Web version of approved README readme_79054900.html