078.C-0841C


Aigrain/ Bouvier/ Clarke/ Favata/ Flaccomio/ Hebb/ Hodgkin/ Irwin/ Irwin/ McCaughrean/ Moraux/ Scholz

FLAMES

Last update of this page: Tue Oct 7 15:41:35 2008


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Time
Critical

Special Remarks:
To be executed during the Nov 24-27 SM run (or, as a 2nd choice, during Dec 12-18)

Abstract for MTS:
Programme includes 3 runs, of which A is in VM (4H2 starting on Oct 31), and B and C are in SM. Each SM run (B and C) includes 4 OBs, using 2 different wavelengths settings, and 2 fibre configurations. Please check detailed and extensive README for more info. Requirements: 1. this is run C which should follow run A by ~1 month, which would then be around Dec 4. However, telescope is not available in this period because of the M1 coating. PI said that SM window at the end of November is better than SM window in mid December, but both are acceptable. 2. fulfilling the observing conditions constraints takes priority over respecting the precise time intervals (i.e. 0.8" seeing and CLR conditions are more important that executing these OBs in the SM run at the end of Nov compared to the SM run in Dec) 3. if possible, the 2 OBs which use the same wavelength setting are executed on the same night. For this run, the pairs using the same set-up are: (ONC1R-C,ONC2R-C) and (ONC1B-C,ONC2B-C) 3. PI has assigned higher priority to the OBs using the reddest setting (H875.7), i.e. ONC1R-C and ONC2R-C


Run status page 078.C-0841C

README of this run:

Web version of approved README readme_78084102.html