Last update of this page: Tue Jul 29 15:41:14 2008
Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | |
|---|---|---|---|---|---|
|
Special Remarks:
NO REMARKS
Abstract for MTS:
One AMBER observation in MR mode with 1 wavelength setting of the Mira star RR Aql. This RR Aql observation shall be carried out approximately in September since it represents a second epoch after run A in July.
The visibility on the long baseline will be low, but experience from P76 has shown that fringes of similar correlated magnitude and visibility value can be tracked, plus this baseline is bootstrapped by the two shorter baselines, i.e. fringes shall be searched on UT1-2 and UT2-3.
README of this run:
Web version of approved README readme_77063001.html