Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | |
|---|---|---|---|---|---|
|
Special Remarks:
note strategy change after simultaneous observations with AMBER could not be scheduled!
Abstract for MTS:
Time-critical monitoring of a variable star. The strategy has been revised after
it was not possible to schedule the FEROS observations simultaneously with the AMBER ones! The plan is now as follows:
OB 4: execute as soon as possible, at the beginning of the night.
OB 5: execute on the same night as OB 4.
OB 3 and OB 6: to be executed in August, preferrably at the beginning and the middle of the month.
OB 7 and OB 8: to be executed in September, preferrably at the beginning and the middle of the month.
Please note that the time constraints given in the OBs and the README file are now obsolete and should be disregarded! Only the information given here must be taken into account.