076.D-0338A


Wittkowski/ Boboltz/ Driebe/ Ohnaka

AMBER

Last update of this page: Thu Jul 24 15:41:17 2008


Run State: TERMINATED/NS

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Time
Critical

Special Remarks:
Remaining OBs of runs A-C preferred in mid-March to meet re-scheduled VLBA observations.

Abstract for MTS:
AMBER observations in LR mode of the Mira stars S Ori and GX Mon. This run A is related with MIDI runs B-D; and the remaining OBs of runs A-C shall, if possible, be executed within about 1 month for each of the targets separately. To meet re-scheduled concurrent VLBA observations, mid-March is preferred for the remaining observations. Any baseline configuration can be used for this.


Run status page 076.D-0338A

README of this run:

Web version of approved README readme_76033800.html