076.D-0142D


Maxted/ Marsh/ Dhillon/ O'Donoghue/ Morales-Rueda/ Smalley

UVES

Last update of this page: Thu Jul 24 15:41:17 2008


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?

Special Remarks:
Execution of runs (A), (B), (C) and (D) must be separated by more than 12 hours!

Abstract for MTS:
This programme aims at studying the RV curve of a single target, whose period is about 0.3 days. It includes 4 identical runs (ABCD), which have to be executed with a time separation larger than 12 hours. Each run is composed by 4 OBs. Ideally, these OBs should be spread as much as possible across several nights. All OBs of a given run have to be executed before moving to the next run. The time interval between the execution of the last OB of a given run and the first OB of the next one has to be at least 12 hours.


Run status page 076.D-0142D

README of this run:

Web version of approved README readme_76014203.html