Last update of this page: Thu Jul 24 15:41:17 2008
Run State: COMPLETED
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? |
|---|---|---|---|---|
Special Remarks:
Execution of runs (A), (B), (C) and (D) must be separated by more than 12 hours!
Abstract for MTS:
This programme aims at studying the RV curve of a single target, whose period is
about 0.3 days.
It includes 4 identical runs (ABCD), which have to be executed with
a time separation larger than 12 hours.
Each run is composed by 4 OBs. Ideally, these OBs should be spread as much as possible across several nights. All OBs of a given run have to be executed before moving to the next run.
The time interval between the execution of the last OB of a given run and the first OB of the next one has to be at least 12 hours.
README of this run:
Web version of approved README readme_76014203.html