076.C-0145A


Jeffries/ Maxted/ Naylor/ Oliveira/ Burningham

FLAMES

Last update of this page: Thu Jul 24 15:41:17 2008


Run State: COMPLETED

USD review status:
O.K.!

Pre-Imaging? Special-Calibration? Time-Critical? ToO/GTO/Large program? Carry-Over?
Time
Critical

Special Remarks:
Best executed before Jan because of time constraints on following runs B and C (cf MTS + README)

Abstract for MTS:
Programme consists of 3 runs (A,B,and C), that must be executed within some time constraints. Every run contains the same 6 OBs (i.e. they want to observe every OB at 3 different epochs), each of them with a different FLAMES configuration. Time Critical Constraints: run(B) after run(A) by at least 2 days run(C) after run(B) by at least 2 days run(C) after run(A) by at least 60 days PI prefers to get all the OBs in run A done before moving onto OBs in runs B and C, although this is not a necessary condition (in other words, this means that the above time constraints apply to the single OBs, more than to the entire run). Please note that also a partial completion of the sequence of three observations is valuable. cf README for more details.


Run status page 076.C-0145A