Abstract for MTS:
Programme on pre-main sequence Herbig Ae/Be stars mainly for studying their activity level and mass-loss rates. The goal is to reach S/N~100 at 520nm.
Requirement: because of variability of targets, all observations on one cluster (3 OBs) should preferably be executed one after the other, during the same night. In the worse case, each set of 3 OBs can be spread over 2 (3 at most) nights.