Last update of this page: Wed Jul 23 15:41:25 2008
Run State: TERMINATED/EP
USD review status:
O.K.!
| Pre-Imaging? | Special-Calibration? | Time-Critical? | ToO/GTO/Large program? | Carry-Over? | |
|---|---|---|---|---|---|
|
Special Remarks:
Monitoring programme; observe every 15 +/- 5 days!
Abstract for MTS:
Spectroscopic monitoring programme of the Einstein Cross. One target, two masks, 20 OBs. The two masks for each epoch of the monitoring need to be executed close in time (preferrably on the same night); the different epochs are separated by ~ 15 days. The P.I. is requesting that we strictly adher to the constraint set specified within the OBs, i.e. only execute this programme when the image quality is really better than 1.0"!
Note following missed epoch19 observations: Please, execute epoch19 OBs whenever an unexpected Service Mode slot comes up which is not covered by any of the other epochs (for example, Engineering night converted to Service, early finishing of Coating, etc.). Otherwise, those OBs will be lost (for P75).
Note added on 29.06.2005: Following the missing of the observations of several epochs, the P.I. has removed all specific timing constraints from the OBs. Feel free to observe any set of two masks (Q2237_mask1_epochxx and Q2237_mask2_epochxx) whenever the constraints are being met and it has been at least 10 days (ideally 15) since the last epoch was observed.
Note added on 26.08.2005: The P.I. is requesting that the next two epochs for this programme (epoch 23 and epoch 24) will be executed in the UT2 service-mode observing blocks scheduled for August 30-31 (epoch 23) and September 9-14 (epoch 24).
Note added on 08.09.2005: The P.I. has supplied an additional imaging OB (#213399, "Q2237_imaging"). It is intended that this OB is executed immediately preceding one of the remaining MOS OBs, so the P.I. can verify the mask alignment procedure.
README of this run:
Web version of approved README readme_75035000.html