Last update of this page: Thu Mar 3 13:45:32 2005
|
6 done (of 6 OBs)
3.00 hrs done (of 3.00 hrs) |
| PHOT | CLR | THN | THK | Seeing & Airmass Constraints: |
| -- | -- | -- | -- |
Seeing < 0.00 Airmass < 0.00 |
Last update of the USG file: Sep 2 10:25:38 2004
Major Instrument Modes: MIDI PRISM
RA Range: 5:30
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 5.0 1.0 10.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
These are MIDI/PRISM observations of one Mira star, namely S Ori. There are 3 science OBs, one for each of the baselines UT2-3, UT2-4, and UT3-4. These OBs should preferably be executed close to each other, and all 1-3 months after the otherwise identical run A. It is probably best to attempt run A during the end of December MIDI block, and run B during the end of February MIDI block. Some attempt to coordinate with concurrent VLBA observations is desired by the PI, by further communication with Paranal.
Approved README of this run:
Finding charts are attached to the following OBs of this run:
| OB_ID | OB_name | Finding chart |
| OB:176889 | CAL_hd50778-epoch2-b3 | 074.D-0075A.004.jpg |
| OB:176891 | CAL_hd50778-epoch2-b2 | 074.D-0075A.004.jpg |
| OB:176892 | CAL_hd50778-epoch2-b1 | 074.D-0075A.004.jpg |
| OB:176893 | SCI_sori-epoch2-b3 | 074.D-0075A.002.jpg |
| OB:176895 | SCI_sori-epoch2-b2 | 074.D-0075A.002.jpg |
| OB:176896 | SCI_sori-epoch2-b1 | 074.D-0075A.002.jpg |
| OB_ID | OB_name | Ephemeris file |