074.D-0075(B)

PI:Wittkowski/ Boboltz/ Driebe/ Ohnaka

Rank Class: B

MIDI

Last update of this page: Thu Mar 3 13:45:32 2005


 
 
6 done (of 6 OBs)
3.00 hrs done (of 3.00 hrs)

Remaining + and M OBs for this run:
(Explanation of table contents)
PHOTCLR THN THK Seeing &
Airmass
Constraints:
-- -- -- -- Seeing < 0.00
Airmass < 0.00

Last update of the USG file: Sep 2 10:25:38 2004
Major Instrument Modes: MIDI PRISM

RA Range: 5:30

Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 5.0 1.0 10.


Pre-imaging run? No! Chilean run? No! Special calibrations? No!
Time critical? Yes! ToO? No! Carry-over run? No!


Special Remarks:
To be executed after run A, and all OBs preferably close in time. NO_REMARKS


 

These are MIDI/PRISM observations of one Mira star, namely S Ori.
There are 3 science OBs, one for each of the baselines UT2-3, UT2-4, and
UT3-4. These OBs should preferably be executed close to each other,
and all 1-3 months after the otherwise identical run A.
It is probably best to attempt run A during the end of December MIDI block,
and run B during the end of February MIDI block.
Some attempt to coordinate with concurrent VLBA observations is desired
by the PI, by further communication with Paranal.
 
 


Information about the progress of this run:

Run status page 074.D-0075B

Approved README of this run:

  • 074.D-0075B.README


    Check which ftp directories exist for this run:
    P74 Directory exists for 074.D-0075B

    Finding charts are attached to the following OBs of this run:
    OB_IDOB_name Finding chart
    OB:176889 CAL_hd50778-epoch2-b3 074.D-0075A.004.jpg
    OB:176891 CAL_hd50778-epoch2-b2 074.D-0075A.004.jpg
    OB:176892 CAL_hd50778-epoch2-b1 074.D-0075A.004.jpg
    OB:176893 SCI_sori-epoch2-b3 074.D-0075A.002.jpg
    OB:176895 SCI_sori-epoch2-b2 074.D-0075A.002.jpg
    OB:176896 SCI_sori-epoch2-b1 074.D-0075A.002.jpg

    Ephemeris file attached to the following OBs of this run:
    OB_IDOB_name Ephemeris file