RA Range: 01:30 (single target)
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 2.0 1.0 50.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
J-band MR and LR spectroscopy of a supernova. Essentially no obs. conditions constraints. Their original timing constraints included maximizing the time between run A and C, but were lifted (18.08.2004) by the PI. But in any case, please complete run A before starting run C. The acquisition strategy had been changed following a ticket (USG-11058). Now, the host galaxy due east of the SN is to be acquired directly, this should with the PA of 90 then include the SN.
README of this run:
Finding charts are attached to the following OBs of this run:
| OB_ID | OB_name | Finding chart |
| OB:155706 | SCI isaac SW_LR-epoch2-a | 073.D-0338C.001.jpg |
| OB:155708 | SCI isaac SW_LR-epoch2-b | 073.D-0338C.001.jpg |
| OB:155709 | SCI isaac SW_LR-epoch2-c | 073.D-0338C.001.jpg |
| OB:155710 | SCI isaac SW_MR-epoch2-a | 073.D-0338C.001.jpg |
| OB:155711 | SCI isaac SW_MR-epoch2-b | 073.D-0338C.001.jpg |