073D0214A.html |
RA Range: 15h
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
1.4, CLR, 1.5, 1.0, 60
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Single target program aimed at constraining the period of the third component of the Cen X-4 system. Requirements: there is a total of 4x1h OBs, that need to be executed one every 3/4 days. The 4 OBs should span at least 10 days, and at most 20 days (if possible, see README for more info).
README of this run:
Check if ftp directory/ies exist/s for this run:
P72 Directory does not exist for 073.D-0214A
P73 Directory exists for 073.D-0214A
P74 Directory does not exist for 073.D-0214A
P73 run ...search for JPEG finding charts in database:
Finding charts, click on them to display:
| OB_ID | OB_name | Finding chart |
| OB:153677 | CenX4-2 | 073.D-0214A.001.jpg |
| OB:153679 | CenX4-1 | 073.D-0214A.001.jpg |
| OB:153680 | CenX4-0 | 073.D-0214A.001.jpg |
| OB:153681 | CenX4 | 073.D-0214A.001.jpg |