RA Range: MOV target
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0, CLR, 1.8, 1.0, 60
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Goal: obtaining spectra at different distances from the nucleus of the bright comet C/2002 T7. There are 4 series of OBs (D1,2,3,4, all with the same setup), each series with a different offset from the nucleus specified (from farthest D1 to closest D4). Requirements (cf README for more details): 1. all OBs should be executed between May 24 and June 10!! The 4 OBs of series D1 should be started and completed asap after May 24. 2. it is better to complete all OBs of a given series as close as possible in time. 3. you will need to edit the OBs and enter the following information (from the 073.C-0525C.001.eph file): precise coordinates, additional tracking velocities (given in "/sec) and Position Angle (PsAng). 4. acquisition should be done on the center of light (nucleus) of the comet.
README of this run:
Check if ftp directory/ies exist/s for this run:
P72 Directory does not exist for 073.C-0525C
P73 Directory exists for 073.C-0525C
P74 Directory does not exist for 073.C-0525C
P73 run ...search for JPEG finding charts in database:
Finding charts, click on them to display:
| OB_ID | OB_name | Finding chart |