RA Range: 1:12 & 5:52
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
2.0 3THN 1.4 1.0 30.
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
Continuation of the same program in previous periods. This run includes observations of two quasars with SWS-LR (1 OB each), SWS-MR (1 OB each), and SWI Ks Imaging (1 OB each). SWS-LR and SWS-MR of the same source shall be done within 1-2 days from each other. The images shall be taken within 2-3 days from the spectra of the same source. All observations of this run shall be done in the month September. Together with runs B and C, this is a monitoring program and will be repeated every month. Execution around each full moon is preferred.
README of this run:
Finding charts are attached to the following OBs of this run:
| OB_ID | OB_name | Finding chart |
| OB:157560 | Q0551_2004_sep_ima | Q0551_C.jpeg |
| OB:157562 | Q0551_2004_sep_speclr | Q0551_C.jpeg |
| OB:157566 | UM87_2004_sep_speclr | UM87_C.jpeg |
| OB:157567 | UM87_2004_sep_specmr | UM87_C.jpeg |
| OB:157563 | Q0551_2004_sep_specmr | Q0551_C.jpeg |
| OB:157564 | UM87_2004_sep_ima | UM87_C.jpeg |