072D0524A.html |
RA Range: 10:45
Constraint set (Typical seeing, Transparency,Airmass, FLI, Moon distance):
1.0 3THN 3.5 1.0 30.0
| Pre-imaging run? |
|
Chilean run? |
|
Special calibrations? |
|
|
| Time critical? |
|
ToO? |
|
Carry-over run? |
|
This is the continuation of 071.D-168(A), aimed at the follow-up of the so-called "spectroscopic event" in Eta-Car. The OBs do not have an exact time constraint, but since the PI wants to have a good time coverage, a roughly constant observing frequency should be used. This turns into one OB per month between October 2003 and April 2004. At the beginning of the period Eta-Car is pretty low on the horizon, but they are ready to accept airmasses as high as 5. For each month the PI has submitted two OBs, one for DIC1 and one for DIC2 (named as xxx-1 and xxx-2). They should be executed during the same night, possibly one after the other.
README of this run:
Check if ftp directory/ies exist/s for this run:
P71 Directory does not exist for 072.D-0524A
P72 Directory exists for 072.D-0524A
P73 Directory does not exist for 072.D-0524A