|
European
Southern Observatory
New Technology Telescope |
| General : | |||||
| Observations : | |||||
| Operations : |
![]()
|
Procedure:
|
CCD R.O.N. / Gain / Shutter delay measurement |
|
Author:
|
Paul Le Saux & Vanessa Doublier |
|
Version:
|
1998 Jul. 30 |
The CCD tests should follow the procedure:
- For EMMI:
- mount respective beta lights in red and blue filter wheels
- Update EMMI configuration panel with mouse on filter columns.
- Make sure B nasmyth shutter is closed.
- Switch off the EMMI room light.
- Start template ~emmi/emmi_setup/DIMDMT01.obd; no parameters are needed.
At the end of the test, MIDAS-PCO will display a graph with the Bias level, Gain, RON and flatfield intensity level parameters. Use this plot for checking that the values are consistent with the previous ones.- Operation lasts 3200 sec.
- Do not forget to dismount the beta lights and update the EMMI configuration panel.
- For SUSI2:
- mount SUSI2 beta light in filter wheel
- Update SUSI configuration panel with mouse on filter column.
- Make sure A nasmyth shutter is closed.
- Switch off the SUSI room lights.
- start template: ~susi/SMT01.obd; no parameters are needed.
Both binning 2x2 (14 sec) and 1x1 (40 sec) tests have been merged into this new template, you don't need to execute the old ones.
A plot will pop-up on MIDAS-PCO, use it for checking the new parameters values against the previous ones.- Operation lasts 1800 sec.
- Do not forget to dismount the Beta light and update the configuration panel.
- For Both test:
- The plots are found on wemmi ins:/midwork/visualize_emmi.ps or visualize_susi.ps
- At the end of both test, a fortran program is run automatically to create the CCD-parameters Webpage.
- The page is found on epu under the directory ~/nttoperations/refdata/param_ccd.html.new
- If the values displayed during the tests are satisfactory, on epu, copy the previous page into param_ccd.html.old, and move the new page as param_ccd.html.
- If the values are not satisfactory, don't make the change. Just notify the Web "master" that no update is available.
- AND in case of the latter: inform CCDScientist of NTT Team and ODT
| Send
comments to: NTT Webmasters <nttweb@www.ls.eso.org> Last Update: MMM DD, YYYY (WHO) |