EMMI CCD Dewar Refilling
This is the actual procedure to refill the CCD Dewar of EMMI twice a day, preferably
at 8 a.m. and at 6 p.m. :
- If EMMI is not horizontal set it manually to horizontal position.
- Push the EMMI central red interlock.
- Measure the vacuum in red and blue dewars and
write them down on the log sheet.
After checking vacuum,notify ODT if the value is above 5 x 10-4.
- Look at both Pulpo displays : temperature should be 152 K in red and 175
K in blue .
- If the previous values are noticeably different, do not refill and inform
ODT.
- Write down the date, time, temperature and operator signature on the log
sheets.
- If a LN2 tank is empty, IMMEDIATELY
execute NITROGEN
TANK exchange procedure.
- Always discharge yourself by touching the instrument structure before touching
the CCD dewar
(while holding the metallic LN2 hose in order to discharge the bottle too as
it has rubber wheels).
- Introduce the tank tube into the dewar inlet.
- Screw the ring a few turns around it.
- Take care that the overflow plastic hose is not oriented toward the dewar
valve or vacuumeter connector.
- Open the tank valve until liquid nitrogen overflows.
- Close the tank valve.
- Unscrew the tank tube ring with gloves and removes the hose gently
from the dewar inlet :
- Remove the tank away from the instrument.
- Release EMMI central red interlock.
- Fill the log
sheet in the control room..