EUROPEAN SOUTHERN OBSERVATORY
La Silla - Science Operation Department
FEROS daily checks
Version: 1.0 2002-11-06 Ivo Saviane
Every day
1
Check appearance of bad columns : from bias frame (aver/row on a median of 5 bias frames). It can signal too high pressure in the dewar.
2
2.5
morning and evening, check env monitor, at
http://www.ls.eso.org/lasilla/sciops/2p2/EnvMon/E1p52/
-> T=17C?
?
3
2.2
are the two slices, of each fiber, evenly illuminated in FFs? If not, check the alignment of the image slicer
4
ThAr lamp should run at nominal current (e.g.
,
are used at Paranal). This increases lifetime.
5
2.7
Check that FF lamps are running at constant current
6
2.10
Check UT of BIAS PC and INS workstation
7
Are slices aligned along CCD rows? If not, was CCD dismounted ``yesterday''?
Comments
Last Update: 2002-Nov-06 is
[
ESO
|
LaSilla
|
SciOp
|
SciOpInternal
]