Technical Requirements for VLT Visitor Instruments

The Visitor Focus has been reserved to permit innovative observations by teams using stand-alone instruments. The Visitor Instrument (VI) teams should in particular be able to react quickly to new scientific and/or technical opportunities. VIs are therefore free from a substantial fraction of the requirements imposed on VLT facility instruments.

The requirements of the VLT towards VIs are collected in the "Requirements for Visitor Instruments on the VLT UT3 Visitor Focus" (VLT-SPE-ESO-10000-3912 issue 1 dated 27.09.2007). Although this document has been prepared with great care it is strongly recommended that a VI team double-check with ESO (through the contact person assigned to the instrument in question) all necessary details before designing critical items.

We make available here as separate pdf files with higher resolution than in the document appendix the applicable interface drawings:

ADWG
Drawing title Drawing nr
N1
VLT-Nasmyth Interface
Nasmyth Instrument Flange A
Rotator, cross section
VLT-DWG-ESO-11420-2615
N3
VLT-Nasmyth Interface
Nasmyth Platform A
Top view and floor requirements
VLT-DWG-ESO-11420-2617
N4
VLT-Nasmyth Interface
Nasmyth Instrument Flange A:
Front view with telescope installations
VLT-DWG-ESO-11420-2618
N6
VLT-Nasmyth Interface
Nasmyth Platforms
Access and handling constraints
VLT-DWG-ESO-11420-2620
C3
VLT-Cassegrain Interface
Observing Floor Plan
Installations and floor loads
VLT-DWG-ESO-11430-2054 (colour or b/w)

A data sheet for the portable LN2 storage tanks (type XRP 120) used on Paranal is available here.

You can get an overview of the Melipal (UT3) Visitor Focus Nasmyth platform and its surroundings by visiting our Gallery.

 