Generated by ARS on 10/18/2005 3:28:15 PM ACTION ITEMS LIST FOR ENGINEERING, MAINTENANCE, AND LOGISTIC Telescope : ESO NTT Create-date : 6/14/2005 2:49:14 PM Problem Short Description : Increase between 3 and 10 times the efficiency of the calibration lamp for EMMI in echelle mode Action : Locate, procure, install, and test a different type of calibration lamp. Action Log : 6/20/2005 9:49:37 AM agilliot The new lamp type is requested to Paranal for a test, if spare exists. 7/5/2005 2:26:11 PM gandreon No answer yet. 7/9/2005 11:52:43 AM agilliot Received answer concerning the normal lamp type and again requested with a lamp sketch ... 7/19/2005 3:59:41 PM gihle Lamps purchase request was sent. Now waiting for their arrival. 8/17/2005 10:23:06 AM agilliot Probable delay due to the holiday season in Europe 8/30/2005 2:19:37 PM gandreon AGI did contact the provider directly at the end of July. Waiting for delivery. 9/6/2005 2:34:14 PM gandreon The PO has a delivery date (in Garching) of 31/8 10/4/2005 2:50:18 PM gihle No news 10/11/2005 2:24:24 PM gandreon Please enquire the status of the Order. Responsible : Engineering (Instrum.) Status : Assigned Deadline : Deadline Status : Not Assigned Created by : gandreon Created on : 6/14/2005 2:49:14 PM ____________________________________________________________________________________________________ Telescope : ESO NTT Create-date : 9/5/2005 9:14:18 AM Problem Short Description : TCCD & SCCD Cooling System water leak and/or over pressure protection Action : Stop the cooling system in case of water leak or flow pressure out of the range. Also provide warning alarms for preventive actions (similar to the one installed at the 360 some time ago). Action Log : 9/29/2005 10:51:38 PM ebarrios Status Maintenance Departament Work Luis Aguila has already a prototype done, i.e. ready to be wired to a LCU. I saw it working in its lab, but, some test have to be done at the telescope to measure its performance whith the rotator and the adapter guide-probe function movements.. Engineery Department: Work Electronic => wire to LCU ? Software => Implement the pop-up alarms by pressure and/or water leak ? 9/29/2005 10:53:46 PM ebarrios Sorry, Sorry... => Maintenance work done by "DON LUIS WENDEGAS". 10/18/2005 3:25:33 PM gandreon The alarm should be as simple as possible. Responsible : Engineering (Mechanics) Status : Assigned Deadline : 11/15/2005 12:00:00 AM Deadline Status : Pending Created by : ebarrios Created on : 9/5/2005 9:14:18 AM ____________________________________________________________________________________________________ Telescope : ESO NTT Create-date : 9/18/2005 12:09:32 PM Problem Short Description : no access to dome lamps control from wsusi Action : please allow access to lt5m3 from wsusi as it already works from wsofi and wemmi : this is necessary to allow automatic control of flat field levels. Action Log : 10/1/2005 4:46:16 PM vgonzale Implemented on ntt module, version 6.21. Installed on wt5tcs. Commissioning pending. 10/2/2005 6:30:00 PM plesaux commissionned OK : lamps are now controlled by SUSI_img_cal_DomeFF template. Please close. Responsible : Engineering (Software) Status : Closed Deadline : 10/4/2005 12:00:00 AM Deadline Status : Closed on Time Created by : plesaux Created on : 9/18/2005 12:09:32 PM ____________________________________________________________________________________________________ Telescope : ESO NTT Create-date : 10/18/2005 3:24:18 PM Problem Short Description : SOFI wheel unreliable again Action : Reinstall the patch for unidirectional movement. Action Log : Responsible : Engineering (Software) Status : Assigned Deadline : 10/25/2005 12:00:00 AM Deadline Status : Pending Created by : gandreon Created on : 10/18/2005 3:24:18 PM ____________________________________________________________________________________________________ Telescope : ESO 360 Create-date : 8/23/2005 3:26:49 PM Problem Short Description : EFOSC 2 slit is in bad shape. Action : A new one should be procured and installed. Action Log : 8/30/2005 2:23:35 PM gandreon The PR to the belgian firm that provide these slits will be prepared this week. 8/30/2005 5:34:33 PM agilliot Labelcomat has been our provider for these slits ... a new order must be done .. 9/2/2005 8:51:21 AM agilliot Drawing of the slit are mising and must be repeated to proceed with the order. A specail set of 90deg rotated slit must be also prepared. 9/6/2005 2:35:44 PM gandreon J Carlos will make the drawing this week. 9/13/2005 2:53:04 PM gandreon Information is ready. Pls issue the PR asap. 9/23/2005 12:40:38 PM agilliot Drawings found .... to be updated asap for the ordering (not urgent anyway) 9/27/2005 2:41:54 PM gandreon EAR will make exact measurement of existing slit. 10/11/2005 2:25:49 PM gandreon Please take action. 10/13/2005 3:13:46 PM agilliot Purchase order issued today to Labelcomat Belgium company Responsible : Engineering (Instrum.) Status : Completed Deadline : 10/18/2005 12:00:00 AM Deadline Status : Pending Created by : gandreon Created on : 8/23/2005 3:26:49 PM ____________________________________________________________________________________________________ Telescope : ESO 360 Create-date : 9/12/2005 10:27:32 PM Problem Short Description : 360 Old computer room Air Condition PWR breaker Action : Current system should have an independent power breaker. Now if the light bulbs burns out power breaker will be off and the air conditioning too. Please make it independent Action Log : 10/11/2005 2:27:05 PM gandreon It came out that there was already an independent switch. CLOSED NO ACTION Responsible : Infrastructure Support Group Status : Closed Deadline : 9/27/2005 12:00:00 AM Deadline Status : Closed on Time Created by : ebarrios Created on : 9/12/2005 10:27:32 PM ____________________________________________________________________________________________________ Telescope : ESO 360 Create-date : 9/19/2005 5:21:05 PM Problem Short Description : darken EFOSC MOS plates Action : darken 140 EFOSC MOS plates which have been rescued by Mechanics Action Log : 9/20/2005 3:39:05 PM gandreon Some 40 to be delivered this week. 9/27/2005 2:42:22 PM gandreon Not done. Another try this week. 10/2/2005 6:31:24 PM plesaux 40 plates delivered today 10/4/2005 2:54:25 PM gihle The complete delivery will be done this week. Responsible : Engineering (Mechanics) Status : Completed Deadline : 10/4/2005 12:00:00 AM Deadline Status : Pending Created by : plesaux Created on : 9/19/2005 5:21:05 PM ____________________________________________________________________________________________________ Telescope : ESO 360 Create-date : 9/20/2005 3:43:53 PM Problem Short Description : Malfunctions in HARPS air conditioning are indirectly detected after day(s). Action : Connect this Airco to the alarm system. Action Log : Responsible : Maintenance Dep. Status : Completed Deadline : 10/18/2005 12:00:00 AM Deadline Status : Pending Created by : gandreon Created on : 9/20/2005 3:43:53 PM ____________________________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 9/20/2005 7:50:58 AM Problem Short Description : replace Nitrogen Gas by Dry Air Action : replace Nitrogen Gas by Dry Air from Mirror 1 support system as in Paranal Action Log : 9/20/2005 3:40:12 PM gandreon A system similar to the one used at PAO will be manifactured. Responsible : Engineering (Mechanics) Status : Assigned Deadline : Deadline Status : Not Assigned Created by : plesaux Created on : 9/20/2005 7:50:58 AM ____________________________________________________________________________________________________ Telescope : DIMM Create-date : 9/27/2005 2:36:57 PM Problem Short Description : All sky camera needs to be resetted from time to time. Climbing to the platform at night is dangerous. Action : Design some remote control for switching off and on the camera. Action Log : 10/5/2005 8:19:45 AM plesaux Remote control means a reset button at the foot of the pilar or in the DIMM bungalow. 10/7/2005 8:54:51 AM amacchin We start to work in the study of the problem. 10/11/2005 2:29:55 PM gandreon Looking for a suitable switch. Responsible : Engineering (Electronics) Status : Assigned Deadline : 10/25/2005 12:00:00 AM Deadline Status : Pending Created by : gandreon Created on : 9/27/2005 2:36:57 PM ____________________________________________________________________________________________________ Telescope : SAFETY Create-date : 9/13/2005 2:56:03 PM Problem Short Description : There is no access to the external parts of the Ritz air conditioning located under the building. Action : Please make a walkable track for inspection and maintenance of these equipment. Action Log : 9/27/2005 2:42:44 PM gandreon Planned by F Luco. Responsible : Logistics(Site Maint.) Status : Assigned Deadline : Deadline Status : Not Assigned Created by : gandreon Created on : 9/13/2005 2:56:03 PM ____________________________________________________________________________________________________ Telescope : RITZ Create-date : 6/21/2005 2:43:19 PM Problem Short Description : Insufficient illumination on some desks Action : Install new lamps hanging from the ceiling Action Log : 7/27/2005 3:12:47 AM gandreon Lamps will be purchased by SciOps. 8/30/2005 2:29:57 PM gandreon JMI/EMA should select the lamps within three months of the opening of this point (that is before September 21), or it will be rejected. If any problem, pls comment here. 9/13/2005 2:54:09 PM gandreon Deadline for the lamps procurement is now mid October. 9/26/2005 10:23:47 PM plesaux lamps bought and sent to La Silla Responsible : Logistics(Site Maint.) Status : Closed Deadline : 10/11/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gandreon Created on : 6/21/2005 2:43:19 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 6/28/2005 4:54:21 PM Problem Short Description : New network connections are required in the Engineering building and in UPS rooms. Action : Intall the access points according to Percy list. Action Log : 7/15/2005 9:57:53 AM gihle IT is trying to find the tools required for this work. 7/19/2005 4:04:38 PM gihle Mechanics should define where and the number of points required in the workshop. 8/9/2005 3:08:29 PM gandreon Rescoped since 30+4 access points are required. 9/6/2005 2:37:37 PM gandreon The access points for Software are urgent and will be given priority. 9/6/2005 2:39:58 PM gandreon List of points: Software Premises ================= - Future IKA/Programmers office : 4 network point in wall by the window. - Future Programmers office : 2 + 2 network points by the window wall. In this office there are already 4 points placed. - Computers Office : 2 + 2 network points in walls by the door, and in front of the wall Mechanics Premises ================== - Mechanics Office : 2 network points by the north window. move 2 existing points in the east wall from the corner, to center of the wall - Assembly Office : restore previously existing points that were move to CNC machine to this office. 2 network points by the CNC machine 2 network point by pilar of the south window This gives a total of 16 new network points. 9/27/2005 2:43:55 PM gandreon Temporary installation in place. To be replaced by final one asap. Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 9/28/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gandreon Created on : 6/28/2005 4:54:21 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 7/19/2005 3:54:23 PM Problem Short Description : Dewars and transfer lines are not identified for a proper maintenance. Action : To label for identification dewars and transfer lines with a secure system Action Log : 8/23/2005 3:32:31 PM gandreon L Gonzales is sick. Posponed to his following turno. 8/30/2005 2:30:42 PM gandreon LGO will arrive this Friday, hopefully to work on this point. 9/20/2005 3:40:53 PM gandreon Labels manufactured. To be installed. 10/11/2005 2:31:59 PM gandreon This week, may be. Responsible : Engineering (Mechanics) Status : Assigned Deadline : 8/31/2005 12:00:00 AM Deadline Status : Overdue Created by : gihle Created on : 7/19/2005 3:54:23 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 8/16/2005 2:59:43 PM Problem Short Description : New offices for Software developers are not equipped with UPS and related sockets. Action : Prepare a plan with the list and position of new sockets and the related shopping list. Action Log : 8/18/2005 5:26:44 PM laguila En la nueva sala laboratorio de software en edificio de ingienería se consideraría lo siguiente: - 18 enchufes de UPS en circuitos monofásicos - 2 enchufes de UPS en circuitos trifásicos Se considera una potencia máxima a utilizar a futuro de UPS en 13.3KVA ( 10KW ) EL suministro de energía se haría desde UPS en Tel. 2.2 Esta unidad es de 40KVA y actualmente se utilisan 8.5KVA en Tel. 2.2 Por lo tanto no habría problema para, el suministro desde esta unidad ya que quedaría una potencia remanente de aproximado 15KVA para futuros usos en telescopio 2.2 Costos de instalación desde UPS Tel. 2.2 ( Materiales ) - Cable de 5x25 mm2 ( 400mts) =EUR 5.243,1 - Tablero de dist. =EUR 526,9 - Canaletas - accesorios =EUR 466,9 - materiales varios =EUR 230,7 Total..........................................=EUR 6.467,6 Se consideran 2 Técnicos para el Trabajo de instalación Tiempo estimado 2 Semanas ( 160 HH ) 8/23/2005 3:34:11 PM gandreon Given the amount, an approval from JSP is required once that the total cost of the move will be known. 9/6/2005 2:40:52 PM gandreon On hold until Sofware moves to Engineering building. 10/11/2005 2:32:53 PM gandreon Cable (400 m) provided by PAO. Responsible : Infrastructure Support Group Status : Closed Deadline : 10/11/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gandreon Created on : 8/16/2005 2:59:43 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 8/16/2005 3:01:13 PM Problem Short Description : New computer room used by software developer is not air conditioned. Action : Move the equipment from the old computer room to the new one. Action Log : 8/23/2005 3:34:43 PM gandreon On hold, until the move is approved and financed by JSP. 8/29/2005 11:34:41 AM laguila Cost approximate moving equipment to new lab. in building ingieneria EUR 340,00 plus 70 HH 9/6/2005 2:41:19 PM gandreon On hold until Sofware moves to Engineering building. Responsible : Infrastructure Support Group Status : Closed Deadline : 10/11/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gandreon Created on : 8/16/2005 3:01:13 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 9/19/2005 7:55:06 AM Problem Short Description : Change operator's generic name in TCS data bases Action : ' cambiar en la base de datos del TCS de NTT y 2p2 en nombre del operador, en Ntt actualmente es " NTT-TIO" y debe ponerse " I. CONDOR" en el 2p2 debe ir "I; CONDOR" el 3p6 ya tiene el " I, CONDOR" de todas maneras revisarlo, TODOS headers de los archivos de los telescopios de LA Silla ( archivos fits) deben ir con estos nombres, esta es una orden del Director, Jason. Action Log : 9/29/2005 12:31:27 PM vgonzale To be implemented during next technical time (1st Oct). 10/1/2005 4:48:57 PM vgonzale Implemented on ntt V6.21 and e2p2 V3.66, the 3P6 telescope didn't need to be changed. Installed on wt5tcs and w2p2tcs respectively Commissioning pending. 10/5/2005 9:11:35 AM plesaux I; CONDOR replaced by I: CONDOR in 2.2 tel due to software problems. Commisionning successful in all three telescope Responsible : Engineering (Software) Status : Closed Deadline : 10/4/2005 12:00:00 AM Deadline Status : Closed on Time Created by : plesaux Created on : 9/19/2005 7:55:06 AM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 10/4/2005 3:00:22 PM Problem Short Description : The old 1st floor toilets ventilation system is in the actual computer's room. Action : To remove the ventilation unit from the computer's room and to install it outside the building in order to reduce the noise. Action Log : Responsible : Logistics/Construction Status : Closed Deadline : 10/11/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gihle Created on : 10/4/2005 3:00:22 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 10/4/2005 3:02:19 PM Problem Short Description : Door without lock in the ex-users room at the IT premises Action : Move the lock from the current access door to the glass door of the ex-users room. Action Log : Responsible : Logistics/Construction Status : Assigned Deadline : 10/25/2005 12:00:00 AM Deadline Status : Pending Created by : gihle Created on : 10/4/2005 3:02:19 PM ____________________________________________________________________________________________________ Telescope : GENERAL Create-date : 10/4/2005 6:14:47 PM Problem Short Description : Requirement of UPS at the software offices Action : To install 8xUPS plugs in the software offices Action Log : Responsible : Maintenance Dep. Status : Closed Deadline : 10/18/2005 12:00:00 AM Deadline Status : Closed on Time Created by : gihle Created on : 10/4/2005 6:14:47 PM ________________________________________________________________________________________________