Generated by ARS on 1/16/03 2:50:10 PM ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC Telescope : ESO NTT Create-date : 10/3/02 4:07:20 PM Problem Short Description : One azimuth motor has not been maintained yet. Action : The last azimuth motor should be exchanged with the spare and maintained. One night required. Action Log : 10/10/02 2:47:32 PM gandreon First technical time is in December. 12/5/02 12:28:14 PM gihle The pending azimuth motor was finished and the altitude one was also mounted. Tests were performed resulting in an accepted motor. 12/19/02 4:59:32 PM gandreon To be rescheduled when also a second night would be available as a precaution. 1/9/03 3:13:41 PM gandreon Deadline changed to available test time. Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 1/23/03 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 11/7/02 9:11:27 AM Problem Short Description : In EMMI red dewar one O ring looses tightness when cooled down. Action : It should be replaced during a SOFI oberving period. Action Log : 11/21/02 3:54:07 PM gandreon Waiting for an indium seal that will be provided by Garching. 12/19/02 5:00:26 PM gandreon To be checked with Armin. Responsible : Engineering Dep.(Instrum.) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/5/02 3:17:28 PM Problem Short Description : Feasibility to work with one head leas of the adaptor/AZ/ALT encoders Action : The software team will study the feasibility to work with one head less in degraded mode. Action Log : 1/9/03 3:15:01 PM gandreon Scope enlarged to AZ/ALT Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 4/30/03 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/5/02 3:19:15 PM Problem Short Description : New filter holder for slit filter wheel Action : To fabricate a filter holder to be used in the slit filter wheel Action Log : Responsible : Engineering Dep.(Mechanics) Status : Closed Deadline : 12/27/02 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/5/02 3:22:11 PM Problem Short Description : A water tap is required outside Ritz Action : The Ritz building requires a water tap outside (at the entrance) in order that the cleaning team can get the water overthere and not inside in the kitchen or bath room. Action Log : Responsible : Infrastructure Support Group Status : Assigned Deadline : 1/30/03 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/19/02 4:47:37 PM Problem Short Description : ALT motors are still in danger of being damaged by cooling. Action : Cut the cooling pipes and have the electronics inserting a PT100 in a pipe in each motor. Action Log : Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 7/31/03 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/19/02 4:50:03 PM Problem Short Description : Temperature in ALT motors needs to be monitored. Action : Please provide the reading of th temperature of the four motors in the same panel used for the AZ ones. Action Log : Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 7/31/03 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/20/02 10:47:09 AM Problem Short Description : ground loop fringes in RED CCD Action : insulate dewar Action Log : 1/9/03 3:17:18 PM gandreon Free time to work on this CCD is required for this and the O ring change. Responsible : Engineering Dep.(Instrum.) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 1/6/03 11:02:27 AM Problem Short Description : no more dreamweaver access to www ( from meli to epu ) Action : -------- Original Message -------- Subject: Re: /www.ls.eso.org/NttWeb not accessible Date: Fri, 20 Dec 2002 10:36:31 +0100 From: "Michael Naumann - ESO Garching +49 89 3200 6430" Reply-To: "Michael Naumann - ESO Garching +49 89 3200 6430" Organization: European Southern Observatory, Garching near Munich, Germany - http://www.eso.org To: "Paul Le Saux" CC: , References: <3E0226FB.78D10724@eso.org> Dear Paul, you can use the normal Windows networking (SMB) to edit the NTT pages, just map a drive letter to \\www.ls.eso.org\lsweb NFS will no only work from Windows OS PCs with 'non-PCNFS' clients, i.e. Interdrive will not work, Hummingbird should be O.K. My suggestion is to use SMB as this can be used on all Win32 machines without additional software. cheers>