Generated by ARS on 10/3/02 4:19:34 PM ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC Telescope : ESO NTT Create-date : 6/23/02 4:28:52 PM Problem Short Description : Switching from Offline to Online the wheel position is not mantained if normal init does not work. Action : modification in the SOFI SW: The "Fall Back Initialisation" does not prevent the function for which it is set to move during the ONLINE action. We would like to have this feature enabled: i.e. when a F/BInit is performed: 1- there should be a possibility to backup the database (little button to toggle), so in case of LCU reboot or ICS restart, the SW "knows" that there is a F/BInit for a given function 2- after a F/BInit putting the fiunction ONLINE should not trigger the HW init, i.e. the function should not be moved. 3- add a "restore" button on the F/BInit panel in order to remove the F/B Init when the function initialise properly again Action Log : 7/4/02 2:49:57 PM gandreon The VLT software release March 2002 has an undocumented feature that may be used. Pls contact R Schmutzer for details. 8/1/02 4:16:13 PM gandreon Point reopened. R Schmutzer should be consulted in PAO. 8/8/02 3:04:48 PM gandreon B Lopez will follow up. 9/8/02 9:53:44 AM blopez Solution concept investigated together with RSC/PAO. BLO still following up. 9/26/02 3:00:26 PM gandreon Change is much more complicated than expected. A visit to PAO is required. A Loginotti has been involved. Feasibility will be defined by mid November. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 9/30/02 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 7/4/02 2:48:04 PM Problem Short Description : Sliding doors can be controlled only manually. Action : Provide conrol signals and status signals for the remote control of these doors. Signals must be compatible with the ones handled by VME digital I/O board. Action Log : 7/25/02 3:42:21 PM gandreon ISG claims that the signals are already available at one LCU. Point assigned to SWC. 8/8/02 3:12:29 PM jguzman This is the detail action list to be done on this. Module to be modified is nttbu: - Test using inducer tool the signals - Include the new commands for open/close the sliding doors in CDT and CIT files. - The signals are already configured by software, so only the functions handling with the open/close/status signals must be implemented - Add some buttons and status in the control panel. Estimation of the cost effort = 30 - 40 hrs approx. 8/22/02 11:10:53 AM rsoto The control software to open and close the door is ready and tested. Due to safety surprises at the electrical control of the NTT's sliding door, the software could not be installed. The door is not stopped when the safety sensor is activated because a continue signal is sent to open and close the door. A stop signal will be provided as a new bit at the VME to implement the stop command. This action point will be finished after proper setup of control signals (spent time including several tests: 2.5 days aprox.) 9/5/02 3:41:49 PM rsoto A stop signal was provided to VME and the continue signal to open and close the door was replaced to a pulse signal. A suggestion done by Ricardo Parra, due to safety reasons, explains that is neccesary to provide of a continue signal that allow to stop the door when it is opening or closing in case the stop signal does not work. Is neccesary to change the pulse signal to continue signal again and to provide the continue pulse to the VME. Electric technicians will ask for the feasibility of this solution. The Software is ready to the actual configuration. 9/12/02 2:30:14 PM gandreon An auxiliary contact (for safety reasons incase of a cable cut) is needed (ISG). 10/3/02 10:57:57 AM rsoto The software was installed and tested successfully. All the functionalities required by the user are available. The safety engineer approved the new system. Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 9/15/02 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 9/5/02 3:13:14 PM Problem Short Description : Path to elevator at ground floor is not suitable for small wheels. Action : An adequate surface should be installed between the large door and the elevator with dome in default position. Action Log : 9/12/02 2:33:57 PM gandreon A plate will be installed by the construction group as soon as they finish the new building. Responsible : Infrastructure Support Group Status : Assigned Deadline : 10/16/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 9/24/02 5:44:27 PM Problem Short Description : SUSI filters for service Action : We need for a service program of the Period 70, the installation of specials filters (ESO number 709 778 549 548 719 717 725 432 726) in appropriate housing for SUSI2 . We need them as soon as possible, as the program has object at the beginning of the period. Action Log : 9/26/02 3:02:24 PM gandreon The current bottleneck in mechanical workshop may be a problem for a fast delivery. Responsible : Engineering Dep.(Instrum.) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 10/3/02 4:07:20 PM Problem Short Description : One azimuth motor has not been maintained yet. Action : The last azimuth motor should be exchanged with the spare and maintained. Action Log : Responsible : Engineering Dep.(Mechanics) Status : New Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : 8/1/02 4:06:50 PM Problem Short Description : Flat field lamps are controlled manually. Action : They should be controllable by software. Signals are already available in LCU Action Log : 8/8/02 3:12:25 PM gandreon FGU would prefer to deal with this point as a part of a global project for the remote control of auxiliary functions. 9/5/02 3:17:00 PM gandreon Signal are ready for software control. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 12/25/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 9/13/02 11:13:12 PM Problem Short Description : Technical CCD number should be included under configuration control to avoid misaligment between operations and support team. Action : Every time that, for emergency reason, a TCCD is exchanged, the corresponding problem report must be assigned to Instrumentation that will perform all required actions. Action Log : 10/2/02 7:54:25 PM rsoto The script was modified, installed and tested successfully at the 3.6m telescope. The defaults values installed are: Focus Target CCD No F35 l3p6agu 235 F8 l3p6agu 91 l3p6img 34 And the script syntax is: e3p6InstallTCCDs [] [] Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 10/3/02 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 10/2/02 10:03:29 AM Problem Short Description : Repair the floor outside of the elevator at the Observation floor Action : We need to repair the floor outside of freight elevator (montacarga) at the level of Observation floor. To keep in mind in that area Mechanics use heavy machinery. Action Log : Responsible : Infrastructure Support Group Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 8/22/02 1:03:32 AM Problem Short Description : Install new flat field screen Action : Install the old 3.60 ff screen in the 2.2-m dome Action Log : 8/29/02 2:58:30 PM gandreon The old 360 FF screen is too big (4x4m). ISG will investigate the possibility of preparing a new frame 3x3m. 9/5/02 3:20:08 PM gandreon The action is feasible. However: 1) SciOp should confirm that the excess size will not affect FF quality. 2) Two days are required. They should be allocated after September. Responsible : Infrastructure Support Group Status : Assigned Deadline : 10/30/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 8/22/02 3:51:08 PM Problem Short Description : Scattered light in 220. Action : Install rings inside the M1 baffle according to AGI specifications. Action Log : 9/12/02 2:31:41 PM gandreon Rings are being manufactured. 9/26/02 3:06:39 PM gandreon One ring still to be installed during technical time. 10/3/02 4:09:56 PM gandreon This last ring has to be installed together with the Feros adapter. Deadline changed accordingly. Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 10/16/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 9/11/02 8:06:50 PM Problem Short Description : Need pom module and Db branch to do POM for 2p2 a la VLT Action : Both the pom module and Db branch have to be defined in order to carry out the POM in a similar way as 3p6 and NTT. More details, pls contact ebarrios. Action Log : Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 11/13/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : SEST Create-date : 8/15/02 9:05:19 AM Problem Short Description : Crical equipment with not enough backup time Action : Two UPS will be installed to backup time system. Cabling and wall sockets installation is needed. Action Log : Responsible : Infrastructure Support Group Status : Closed Deadline : 9/19/02 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DIMM Create-date : 7/25/02 3:33:56 PM Problem Short Description : Lossam module not installed Action : Install the module as in PAO Action Log : 9/5/02 3:22:15 PM gandreon This action should be done together with the software upgrade, that is now planned for the end of November. Therefore also this deadline will be changed accordingly. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 10/16/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : DIMM Create-date : 8/1/02 3:44:04 PM Problem Short Description : Cover axis is easily broken in bad weather. Action : Analyze the system and locate a possible protection to prevent further failures. Action Log : Responsible : Engineering Dep.(Electronics) Status : Assigned Deadline : 9/30/02 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 11/21/01 5:27:19 PM Problem Short Description : Clean up P2PP configuration on Offline system. Action : After a Problem Request from NTT, Anton investigated the situation of P2PP,here is the report: 11/15/01 11:29:25 aschemrl During my Nov8-15 turno, the analysis of the problem showed the implementation and configuration of jp2pp is a MESS! There are 3p6 users running NTT configurations, which in turn are running WFI jre's. It is obvious that under these conditions a more restrictive solution would take longer to implement on kila, and may not be the ideal solution. This is not an NTT problem, it affects all visiting and local astronomers. A suggestion will be made to create a jp2pp template that will be applied at the time of lsusr account creation. This means running jp2pp on Linux machines that connect to the drl9 server. This will avoid configuration interferences and single user responsibility. This means that jp2pp would be removed from kila. Aproval of this proposal will remain pending until there is a global La Silla agreement among astronom Action Log : 11/22/01 2:37:39 PM gandreon It looks like a good idea. However, his implementation requires a configuration change of Kila & offline systems. To be approved by LSO Management. 12/13/01 3:07:12 PM gandreon FGU sent an email to JME. 12/20/01 3:30:47 PM gandreon P2PP installation in Kila has been cleened up. For the installation on linux boxes, the Director wants written requirements in order to formally start a small project. 1/10/02 2:18:24 PM gandreon JIB volunteered to write draft requirements, to be reviewed by OHA. 1/31/02 2:20:24 PM gandreon Requirements should be sent to OHA. 3/21/02 3:55:01 PM gandreon A meeting is planned for tomorrow (OHA&ASC) 4/18/02 3:58:20 PM gandreon An update procedure has been defined. To be formalized in writing. 5/10/02 9:14:12 AM gandreon One month is required for the doc. 7/11/02 2:58:23 PM gandreon To be competed after the VLT Updates. 9/5/02 3:23:18 PM gandreon Documentation was delivered. It is not clear what is still missing in this point. Responsible : Software&Commun.Supp.T. Status : Completed Deadline : 12/19/01 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 8/1/02 3:24:37 PM Problem Short Description : Location of VME CPU spare unknown to TELMA. Action : Update inventory (if needed) and deliver it to RPA. Action Log : Responsible : Engineering Dep.(Electronics) Status : Assigned Deadline : 9/19/02 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 8/22/02 1:49:30 AM Problem Short Description : Local DSS Action : Currently, we are using the Digital Sky Survey available from ESO Garching. Considering that the whole DSS-1 is ~85Gb, it is now feasible to have it entirely on-line locally on one disk. The work requested can be split in several consecutive phases: - install a local copy of DSS-1 with a web-tool similar to http://archive.eso.org/dss/dss - provide a configuration to point skycat to that local server - investigate the possibility to have DSS-2 on-line locally (volume eqv to 70DVDs). Action Log : Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : 8/22/02 3:49:57 PM Problem Short Description : Filter data base cannot be put online. Action : PC should be cleaned and WinNT pathced against hackers. To be put online only for local access. Action Log : 8/29/02 3:01:11 PM gandreon This can only be done woth a summer student. Two candidates are under consideration. 9/5/02 3:27:39 PM gandreon It seems that the student will work on the final (Unix) installation. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : 9/26/02 2:51:04 PM Problem Short Description : MIDAS path related with error keywords working only at NTT. Action : To be installed on the other telescopes. Action Log : 10/2/02 12:12:28 PM jguzman Patch described in DFS01073 was done in w3p6off and w2p2off for MIDAS version in /scisoft and /vlt/MAR2002. In addition to the keyword described in the DFS Problem report, was changed the keyword in lowercase. In wg5off was fixed for /vlt/MAR2002 midas distribution. TAR should be close. Responsible : Software&Commun.Supp.T. Status : Completed Deadline : 10/10/02 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________