Generated by ARS on 2/28/02 4:29:03 PM ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC Telescope : ESO NTT Create-date : 11/21/01 5:38:13 PM Problem Short Description : Improve M1 C02 cleaning system. Action : We need a larger pipe and better connections between pipe and C02 bottles,wich are used to cleaning M1 mirror,the system must include a bottle transport from storage to Telescope. Action Log : 11/22/01 2:33:20 PM gandreon The new modality should be approved by AGI before starting the job. 1/31/02 2:01:24 PM gandreon Alain must talk with J Miranda during this turno. 2/7/02 2:27:02 PM gandreon An agreement has been reached. A longer pipe and a small carriage (for the 15 l CO2 bottle) shall be purchased. Deadline is for PR. 2/21/02 1:53:40 PM gandreon Carriage ready. Noses ordered. Responsible : Engineering Dep.(Mechanics) Status : Completed Deadline : 2/13/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/5/01 9:01:50 PM Problem Short Description : We need to know the temperature of az motors. Action : To read azim. analog board and display the processed data in Celcius deg. Action Log : 12/12/01 1:32:35 PM jguzman Deadline will be assigned after hardware implementation is specified by NTT team. My suggestions are: 1. Monitoring should be done by azimuth LCU (lt5az). 2. Two hardware implementations: - Use of available analog signals in VMIC board to read the temperature. - Use of external thermometer communicating with the LCUs via RS-232. 3. In both cases SW will implement a polling task with low priority running in azimuth LCU, as a new module. 4. If some protection for overtemperature is required i will suggest to implement a hardware interlock. 12/13/01 2:00:19 PM gandreon The PT100 will be connected directly to the VMIC board, last four points. No H/W interlock is deemed necessary. Two spare sensors will be connected in the positions that correspond to the motors still not controlled. 12/20/01 3:19:49 PM gandreon J Santana will inform SWC as soon as signals will be available in the corresponding module of LCU. 1/10/02 7:34:50 AM jguzman NTT selected the PULPO alternative. New module "nttmon" was implemented and archived. Current status is under test in SWC VLT lab with PULPO hardware but without a PT-100. It is important to test during a couple of days the stability of the connection using at least one sensor in the lab. Following steps: - Finish lab tests, depending of the availability of at least one PT-100 sensor, will take 3 days. - Connect and test at NTT: 3 days. - Acceptance by NTT. Posible deadline: 24/01/2002 or 07/02/2002 depending of hardware availability 1/10/02 2:06:05 PM gandreon RPA can provide a PT100 fro the test. 1/23/02 5:25:27 PM jguzman Monitor system was succesfully tested in SWC VLT lab with PULPO interface and 4 PT-100 sensors. New nttmon module version generated. Ready to be installed and tested at NTT. This will happend during next shift (31/01 - 07/02) in agreement with J.Santana. 2/7/02 9:57:34 AM jguzman Monitor system succesfully installed and tested at NTT. New nttmon module version 1.2 New ntt module version 4.25 Waiting for NTT team acceptance. User Manual pending. Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 1/23/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 12/5/01 9:07:56 PM Problem Short Description : We need to know coil's status of Motor az #4 Action : Open motor #4, inspect the coil, and eventually replace it .Take advantage to do Mechanical maintenance. Action Log : 12/20/01 3:17:25 PM gandreon J. Santana will inform SWC as soon as signals have been made available to the corresponding LCU module. 12/20/01 3:18:33 PM gandreon Disregard previous comment !! Wrong point! 1/17/02 3:42:42 PM gandreon PO has been issued and coil delivered today to the provider in Santiago. Planned repair time is 45 days. 1/18/02 8:47:32 AM gandreon The coil mentioned above is not the one of the motor #4, which still have to be dismounted. 2/7/02 2:32:24 PM gandreon Motor dismounted. Coil looks fine. Waiting for NTT Team decision. Responsible : Engineering Dep.(Mechanics) Status : Closed Deadline : 1/30/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 1/2/02 5:42:44 PM Problem Short Description : Using SOFI, for short exposures with offset switching images are elongated. Action : Assist the NTTT to try to improve the stiffness of altitude servoloop. Changes must be limitied to software defined parameters. Action Log : 1/10/02 2:07:42 PM gandreon Next technical time will be on January 28-31. 2/1/02 9:08:13 AM ikastine New altitutude servo parameters were installed yesterday. Servo is now little bit faster: +20 arcsec offset -> 2.19s, -20 arcsec offset -> 1.10s, before values were 2.19s, 2.71s. However, I don't think this change help solve to elongated image problem. I also reduced trkRadius variable. This variable defines radius where the position has to stays to change telescope status to TRACKING. Before value was so big that status changed to TRACKING almost immediately (~0.3 - 0.4s) after offset. Now change of status takes (1.5-2.0s). This seems to solve elongated image problem according premilinary tests which we performed yesterday night. NTT team did not report any problems in they night report. I recommend NTT team monitor carefully the altitude servo behaving next couple of days, and report to software possible problems. Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 1/30/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 1/23/02 7:38:46 PM Problem Short Description : EMMI and SUSI filters cleaning Action : To improve the image quality is necesary to keep filters clean Action Log : 1/24/02 8:44:40 AM agilliot A suitable period of Sofi could be used to clean at once all the filters. Agreement according schedule must be found during the thursday meeting 1/28/02 1:21:51 PM agilliot still not defined today a sofi period for this action 2/14/02 5:02:09 PM gandreon Available period 19-22/February. 2/26/02 10:38:29 AM agilliot All filters from Emmi and Susi have been checked and cleaned when required Two filters from Emmi present edge ageing and should be replaced within a year delay Responsible : Engineering Dep.(Instrum.) Status : Completed Deadline : 2/21/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 1/31/02 5:44:24 AM Problem Short Description : OT not available in wg5dhs Action : OT and its communication with BoB should be configured for visitors and service@wg5dhs Action Log : 1/31/02 2:03:24 PM gandreon Anton will have a look. 2/7/02 10:06:57 AM aschemrl After analysis, OT is configured properly (paths, db connection). Ohainaut confirms this. There is no Bob specific configuration. OT works just like P2PP in that sense when communicating with Bob. Therefore, testing time should be scheduled (telescope time/Ohainaut availability), and then fix a deadline, depending on date for when OT is required. 2/11/02 3:02:11 PM aschemrl Some existing problems were due to bad TSF. Actual request was to run p2pp and ot at the same time. Tested ok reconfig of flowmgr variable. Back to normal operation. Will formalize next turno. 2/21/02 1:54:10 PM gandreon To be tested this Sunday night. 2/25/02 2:38:40 PM aschemrl Configuration to run p2pp and OT simultaneously was put in place, but OT could not be fully tested. Will wait for Ohainaut and try again next Mar 4. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 2/20/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 2/5/02 3:55:25 PM Problem Short Description : Installation of cooling water for new EMMI Red Fiera System Action : A new set of hoses for cooling water are required on EMMI Red. They should run from the floor cooling system up to the location of EMMI Red Fiera (where current Red LCU is located) Fiera has two chassis which are cooled in series. The cooling is required for April 1st. Action Log : Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 4/3/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 2/5/02 3:57:29 PM Problem Short Description : New mechanical fixation for EMMI Red Fiera Chassis Action : The two Fiera chasis must be installed under EMMI Red where the current EMMI Red LCU is located. Details already discussed with W. Eckert. Required for first week of April. Action Log : Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 4/3/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 2/5/02 4:16:03 PM Problem Short Description : New Fibres are required for EMMI Red Fiera upgrade Action : 4 new pairs of fibres (2 pairs as spares) are needed between the Sparc rack (Adapter B side, Calibration Lamp Control Unit rack, upper part) and the Fiera Box located under EMMI Red side (same place as current EMMI Red LCU). Two pairs of the fibres need RS232 modems (3 modems in total, 2 in use, one spare). The details have already been discussed and agreed (and materials have been ordered and received). Also, an ethernet UTP cable will be needed for the Sparc. Everything is required by the end of March. Action Log : Responsible : Engineering Dep.(Electronics) Status : Assigned Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 2/14/02 5:00:36 PM Problem Short Description : New P2PP is available. Action : Find out if it is required by the depository. If the answer is yes, set it up on a test machine for commissioning. Action Log : 2/21/02 1:55:20 PM gandreon Also a the installation of a Database for test is required since the one available has gone to GVA. 2/25/02 2:47:18 PM aschemrl There are several new versions of p2pp available, the last official one being 2.2.3. However, 2.2.3int1 for integration is also available, and in the near future specific work will be done towards period 70. In all cases all visitor configurations support connection to the Garching repository by default. The telescope version of p2pp points to our (OLASLS) repository, and visitors ftp their obs to the telescope. The question is not clear, and I hope it is answered. When our SWC lab is fully functional, all p2pp versions will be tested offline. At present(starting today), new lsusr accounts have the new p2pp2.2.3 version installed. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 2/27/02 12:13:51 PM Problem Short Description : We need MIDAS 02FEBpl1.0 on wemmi and wg5off Action : Pls install new version of MIDAS, 02FEBpl1.0 on wemmi and wg5off. THAT version of MIDAS contains new FITS reader that is not available on previous versions, and that is required for the EMMI Red upgrade. I recommend installation during the March 4-5 tech. time. (as MIDAS is used for operation, it has to be installed during test time, so that the compatibility with set-up and observation templates can be evaluated). Action Log : 2/28/02 1:34:14 PM gandreon Nobody is available this week. Please indicate next suitable time. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : 10/31/01 11:13:16 AM Problem Short Description : The serrurier temperature is needed as a VLT DB point Action : Create a VLT data base point named "Serurier Temperature" or an acronism of it. The data is read at the l3p6aux, channel 0 of Aio board (0 to 10 volts). The point should be recorded as: SerrTemp = (Chann 0 volts) * A1 + A2 where A1 = 8.25 A2 = -14.3 The last two constant could need a modification from time to time, due to aged components. The unit is degrees centigrade Action Log : 1/10/02 2:08:18 PM gandreon To be tested this week. 1/17/02 3:44:14 PM gandreon Some problem was detected during test. New deadline assigned. 2/14/02 8:57:35 AM vmerino Still under development. It should be finished next week 2/22/02 10:52:18 AM vmerino bugs corrected. Ready to be tested next techtime Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 12/13/01 12:06:05 PM Problem Short Description : Not possible to test F/35 TCCD when Timmi is not mounted Action : Build a 6 channels fibre of 20 mts lenght Action Log : 1/31/02 2:05:30 PM gandreon Fiber has been purchased. Responsible : Engineering Dep.(Electronics) Status : Assigned Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 12/20/01 3:33:04 PM Problem Short Description : EFOSC support has been used for Harps and it is no longer available. Action : A new one should be manifactured using the Timmi 2 design. Action Log : 12/20/01 3:34:03 PM gandreon Urgently needed! Efosc will be mounted on January 10th. 1/17/02 3:49:09 PM gandreon There is a missing part to be designed and manifactured. Responsible : Engineering Dep.(Mechanics) Status : Completed Deadline : 1/9/02 11:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 360 Create-date : 1/10/02 2:02:14 PM Problem Short Description : Dust accumulating on dychroic mirror is degrading performance. Action : Devise and build a suitable cover that should protect the mirror when in parking position while not vignetting in any other condition. If the cover is not fixed, design should be reviewed before implementation (that is it becomes a small project). Action Log : 1/31/02 2:08:07 PM gandreon W Eckert and A Gilliotte will look at the problem on February 20. Responsible : Engineering Dep.(Mechanics) Status : New Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : 1/10/02 2:04:49 PM Problem Short Description : During IQ the image analisys has to be performed manually. Action : Prepare a TCL/TK script for the authomatic execution of the program. Action Log : 1/17/02 3:50:40 PM gandreon Alain should get some help from TCL/TK expert (eg. Emilio) 1/24/02 8:43:11 AM agilliot Emilio has been informed and documentation of the optical analyzis program is on his hands 1/28/02 1:21:22 PM agilliot well advanced tcl/tk programation from Emilio ... close to be finished .... guess during my coming turno 2/21/02 1:56:40 PM gandreon Cahnge of deadline: Emilio and Alain will be back in April. 2/26/02 10:36:51 AM agilliot Need to be present both on la Silla to finish it. The complete image processing is working, still some improvement or fine tuning is required for the analysis phase of the data The goal is now to obtain directly the aberration amount and not only the images for the analysis. This pending issue will replace the shack-hartmann projects Responsible : Engineering Dep.(Instrum.) Status : Assigned Deadline : 4/17/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 1/26/02 1:36:32 PM Problem Short Description : Glycole leak on M1 from Delta axis Action : Upgrade the piping on the delta axis. No connectors, proper insulations, impecable work. This is about the 6th time that it occurs spilling liquids on the mirror and NEEDS to be done properly NOW. Action Log : 1/31/02 2:09:27 PM gandreon L Wendegass will analyze the problem this week. 2/7/02 2:40:17 PM gandreon The leak has been traced to a purger that was designed to work vertically. It will be replaced during the technical time on February 12 and 13 with a more suitable model. After accessing this area from inside the tube, it will be decided if a drain or a small tank will be installed in case of other leaks. 2/14/02 5:06:51 PM gandreon The drain was found in place and working. The insulation of the pipes has been completed or improved. Few white cloths have been left as a check in case of further occurrences of the leak. Responsible : Engineering Dep.(Mechanics) Status : Completed Deadline : 2/13/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 1/31/02 1:57:35 PM Problem Short Description : Support required for coating plant to be used for gold coating. Action : Modify existing parts. Action Log : 2/28/02 1:42:36 PM gandreon Successful test done by LGO. Responsible : Engineering Dep.(Mechanics) Status : Completed Deadline : 2/6/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 10/31/01 2:22:16 PM Problem Short Description : Activate software readout of adpter angle encoder. Action : The value of the telescope adapter angle is currently entered manually at the w2p2tcs. Because this value goes into the headers of the images we request that the encoder value, currently being read by the VME, be obtained automatically. Action Log : 11/8/01 2:17:05 PM gandreon To be done during next technical (full moon) time available. 12/6/01 2:40:45 PM gandreon Deadline changed according to available full moon time. 1/12/02 7:21:29 AM vmerino Must be tested next technical time at the end of January 1/28/02 4:22:09 PM jibsen Changes installed. Please report test results to IKA. 1/31/02 2:11:11 PM gandreon Focus cannot be read anymore. To be debugged during next brigth time at the end of February. 2/4/02 5:14:19 PM rmendez Te be more precise, the next idle time runs between Feb. 24 to March 2, both dates inclusive. In order to do tests, this should be done in the first few days of the said period. 2/13/02 8:15:38 AM vmerino Problems with focus corrected. Adapter angle is now available as well as focus change. Tested manually and throught BOB. Must be installed next tech-time. 2/14/02 9:00:37 AM vmerino An offset to rotator value was applied in order to get 0 degree on panel and header 2/28/02 3:09:14 PM traveler This is a test entry. Pls ignore. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 11/8/01 2:50:54 AM Problem Short Description : Fix filter-change with AG bug in OS. Action : The OS was designed in a way that once an OB is started any interaction with the AG is queued until the observation finishes, and the AG goes into an inactive mode. When changing filters within an OB it is rutinary to have to interact with the AG so that guide star offsets, which are normal from filter to filter, can be adjusted for with a new "pick object" command. Right now OBs witha a change of filter usually hang the system forcing an abort and re-start (FSE). Action Log : 11/8/01 2:17:50 PM gandreon The amount of work involved has to be determined before this point can be assigned. 11/15/01 11:02:14 AM sbaeza Module wfics modified to solve the problem. See last problem report log generated. Under monitoring by MET 12/13/01 2:06:40 PM gandreon A minor problem has to be fixed during next available bright time. 1/31/02 11:40:56 AM sbaeza A timeOut was added to daisycommLite process. The freezing OS problem didn't happen again during idle time test. Under monitoring by MET. An exhaustive code analysis will be done in the ICS package to be sure that the problem will not repeat again. 1/31/02 2:12:01 PM gandreon To be tested during next bright time. 2/7/02 2:46:20 PM gandreon Deadline changed according to bright time. Responsible : Software&Commun.Supp.T. Status : Completed Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 2/5/02 2:55:26 PM Problem Short Description : Need to print current filter database from OS filter setup GUI. Action : We need to be able to print, in a formatted way, the current filter configuartion in the WFI wheel. Please add a "Print" (to file) button to the Filter Database GUI. This will be used to monitor the status of the filter wheel, which is necessary for configuration control. Action Log : 2/28/02 1:43:04 PM gandreon Next turno of SBA. Responsible : Software&Commun.Supp.T. Status : Assigned Deadline : 3/1/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 2/5/02 3:01:00 PM Problem Short Description : Need to put safety rim to filter wheel. Action : We need to install a small metallic rim in the WFI filter wheel to prevent the filters from coming out of their reel when they are in (or close) to the position of the positioning arm. In several occasions the filters have come out, which is extremely dangerous for the safety of the filters. The rim should be easy to dismount for filter interchange. Action Log : Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : 3/30/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 2/27/02 6:36:04 PM Problem Short Description : Need to bypass rheostat to power FF lamp. Action : Since we vary the voltage of the FF lamp depending on filter used, for some filters the voltage is low, and the fan does not turn, the lamp overheats and this shuts off the whole system. So, we need to bypass the rheostat for the fan, but we need to feed the fan from the same supply as the lamp (so that both are turned off with the main switch when not in use). Action Log : Responsible : Infrastructure Support Group Status : Assigned Deadline : 3/7/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : DAN 154 Create-date : 1/17/02 3:40:23 PM Problem Short Description : Manual cleaning of user account in instrument WS at beginning of each run is lenghty and prone to mistake. Action : Prepare and test a script that performs the requested cleaning. Action Log : 1/27/02 3:39:52 PM jibsen Scripts and configuration done as requested by John in a separate e-mail. Please test! 2/4/02 5:21:56 PM rmendez Will be tested by Ivo Saviane between 9 to 13 Feb. Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 2/27/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DAN 154 Create-date : 1/31/02 1:58:43 PM Problem Short Description : Dome slit is not light tight. Action : Replace rubber with a softer one, possibly thicker in the middle. Action Log : 2/14/02 5:08:58 PM gandreon It appears that the action suggested has been already done without full success. Further actions require Director approval. Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : DAN 154 Create-date : 1/31/02 2:00:21 PM Problem Short Description : Focus encoder is failing. No direct replacement available. Action : A spare one should be electrically adapted and the coupling also changed. Action Log : 2/6/02 11:17:47 AM mmornhin I tested a ROD 436.0003-100 encoder proposed by Domingo. It can be adapted, but requires a driver to be added, since it does not provide differential outputs. I will talk this over with Domingo. 2/14/02 5:10:27 PM gandreon The interface board is ready for the exchange of the encoders. MET to provide suitable dates for the installation. Responsible : Engineering Dep.(Electronics) Status : Completed Deadline : 2/13/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : DAN 154 Create-date : 2/7/02 12:16:43 AM Problem Short Description : DFOSC dirty. Action : Perform a clean-up of every component. Take samples for analysis of the contamination source. Action Log : 2/7/02 2:50:32 PM gandreon DFOSC to be dismounted for a clean job. MET to specify possible dates. 2/26/02 10:39:42 AM agilliot about the same point as the slit cleaning Responsible : Engineering Dep.(Instrum.) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 152 Create-date : 1/7/02 3:52:27 PM Problem Short Description : Need a plastic (acryllic) cap for storage of grating. Action : A grism is missing its plastic cap for storage. Please manufacture one. Action Log : 1/10/02 2:12:58 PM gandreon The cap should be in Pelicano, still mounted in the reosc console. If not, Alain can provide a replacement. 2/7/02 2:51:40 PM gandreon One was provided by Alain and another was manufatured. Responsible : Engineering Dep.(Mechanics) Status : Closed Deadline : 2/6/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 152 Create-date : 1/7/02 3:57:10 PM Problem Short Description : Install new calibration mirror for FCU. Action : MEC has finished the maufacturing of the new mirror for the FCU. Now, they need to install it. Best dates are February 18th and 19th, the first 2 days of the FEROS Service Mission. Action Log : 1/10/02 2:13:34 PM gandreon Alain will have a look into this businnes. 2/7/02 2:52:30 PM gandreon J C Pineda will take over this job. 2/21/02 1:58:50 PM gandreon Action on hold until control software modifications can be tackled by ROL. Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : SEST Create-date : 12/16/01 11:03:46 AM Problem Short Description : Shift servo for sub-reflector has erratic behaviour Action : We need a small mount to install the laser/sensor on the shift leg. Action Log : 1/31/02 2:13:49 PM gandreon Waiting for M Anciaux to come back from Europe. Responsible : Engineering Dep.(Mechanics) Status : Assigned Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : 11/21/01 5:27:19 PM Problem Short Description : Clean up P2PP configuration on Offline system. Action : After a Problem Request from NTT, Anton investigated the situation of P2PP,here is the report: 11/15/01 11:29:25 aschemrl During my Nov8-15 turno, the analysis of the problem showed the implementation and configuration of jp2pp is a MESS! There are 3p6 users running NTT configurations, which in turn are running WFI jre's. It is obvious that under these conditions a more restrictive solution would take longer to implement on kila, and may not be the ideal solution. This is not an NTT problem, it affects all visiting and local astronomers. A suggestion will be made to create a jp2pp template that will be applied at the time of lsusr account creation. This means running jp2pp on Linux machines that connect to the drl9 server. This will avoid configuration interferences and single user responsibility. This means that jp2pp would be removed from kila. Aproval of this proposal will remain pending until there is a global La Silla agreement among astronom Action Log : 11/22/01 2:37:39 PM gandreon It looks like a good idea. However, his implementation requires a configuration change of Kila & offline systems. To be approved by LSO Management. 12/13/01 3:07:12 PM gandreon FGU sent an email to JME. 12/20/01 3:30:47 PM gandreon P2PP installation in Kila has been cleened up. For the installation on linux boxes, the Director wants written requirements in order to formally start a small project. 1/10/02 2:18:24 PM gandreon JIB volunteered to write draft requirements, to be reviewed by OHA. 1/31/02 2:20:24 PM gandreon Requirements should be sent to OHA. Responsible : Software&Commun.Supp.T. Status : Completed Deadline : 12/19/01 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 2/7/02 2:24:35 PM Problem Short Description : Videconference over IP must cannot be initiated from PAO due to a routing problem. Action : Make the required changes to the routers involved. Action Log : Responsible : Software&Commun.Supp.T. Status : Closed Deadline : 2/27/02 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : GENERAL Create-date : 2/14/02 10:53:21 AM Problem Short Description : Normal traffic sometime interferes with Video Conference over IP. Action : Treat VC as a separate service in the black box. Action Log : Responsible : Software&Commun.Supp.T. Status : Completed Deadline : 2/27/02 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________