Generated by ARS on June 01, 2000 5:09:06 PM ACTION ITEMS LIST FOR SUPPORT TEAMS AND INFRASTRUCTURE Telescope : ESO NTT Create-date : February 10, 2000 4:13:55 PM Problem Short Description : Image quality software is not implemented in guideprobes. Action : A preliminary analysis and design should be carried out in view of future implementation (possibly by June) Action Log : June 01, 2000 3:44:46 PM gandreon Waiting for delivery of fans. Responsible : Software&Commun.Supp.T. Deadline : August 30, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 10, 2000 4:14:58 PM Problem Short Description : Guideprobes #2 cannot be used. Action : The complete control software for these guideprobes should be implemented, possibly by October. Action Log : Responsible : Software&Commun.Supp.T. Deadline : August 30, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : March 22, 2000 12:17:02 PM Problem Short Description : Upgrade M2 baffle needed. Action : A new baffle has to be built and installed, as described in "NTT mirror seeing improvements" document, approved by JM1 Action Log : April 06, 2000 3:25:28 PM gandreon It's a project already reviewed by the Director. Execution plan to be provided to the NTT team. May 07, 2000 3:29:15 PM gihle Deadline shown is wrong. On Thursday 11th, the person who will fabricate the baffle is arriving and only then we can give a deadline. This was discussed in the TAP meeting and agreed. May 11, 2000 3:37:52 PM gandreon The "deadline" was really ment to provide the deadline for the delivery of the real thing. May 16, 2000 5:39:32 PM gihle After discussion with E.Figueroa, and considering the material delivery, the deadline that we ask for this work is End of July, 2000. Responsible : Mechanics Support Team Deadline : July 26, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : March 22, 2000 12:17:43 PM Problem Short Description : Image quality should be improved under no wind conditions. Action : A set of fans has to be installed around M1, as described in "NTT mirror seeing improvements" document, approved by JM1 Action Log : Responsible : Mechanics Support Team Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : April 06, 2000 3:20:51 PM Problem Short Description : EMMI is no longer protected from rain leaking. Action : A protection should be installed without interfering with the cooling of the CAMAC control. Action Log : April 24, 2000 8:10:06 PM gihle The team will take care to find a "Solar Tech" cover for this purpose. Responsible : Mechanics Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : May 17, 2000 9:43:49 AM Problem Short Description : pc4ntt cannot anymore NFS mount meli:/home/../NEWNTT for Dreamweaver Action : In spite of several phone conferences / pc worksessions with Michael Naumann and Phillip Harboe, we still cannot NFS mount meli/ NEWNTT subdirectory for Dreamweaver as it worked before temporary license of OnNet Interdrive (NFS) downloaded by M. Naumann expired. We need this problem to be solved in order to be able to stick to ESO Web Project rules when maintaining NTT web pages. Action Log : May 25, 2000 3:56:35 PM gandreon In order to NFS mount a disk in Meli on the pc, an NFS client has to be purchased by the Team. The alternative used by the other Teams is file transfer by FTP. June 01, 2000 3:46:17 PM gandreon FGU will clarify the cost of aset of licenses or a site license. Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : May 18, 2000 9:40:42 AM Problem Short Description : Office curtains in bad shape Action : Venetian blinds in offices 19,20,21 should be installed and exising curtains should be refurbished. Action Log : May 18, 2000 3:54:43 PM gandreon This point will be discussed once that the black curtains have been refurbished. Responsible : Infrastructure Support Group Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : May 19, 2000 12:05:28 PM Problem Short Description : Building basement fills with water at every rain and snowfall Action : Ducts which bring the melted snow into the basement have to be sealed. Action Log : May 19, 2000 12:05:28 PM plesaux Untill now water has been removed with buckets up to several days after the falls. This situation is dangerous because several cable paths remain al this time under water. Responsible : Infrastructure Support Group Deadline : Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : May 24, 2000 5:17:31 PM Problem Short Description : TCS Control Panel : Rotator Offset is needed Action : To add a field for the rotator offset in the preset command line. Action Log : May 27, 2000 11:54:46 AM jibsen Modifications are ready. Telescope Time to test the panel is required. I suggest to change the status to completed. Responsible : Software&Commun.Supp.T. Deadline : May 31, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : June 01, 2000 3:41:01 PM Problem Short Description : New electrics plugs are needed for flat field lamps. Action : They should be trifasic, 380 V., not stabilized, one for each side of telescope. Action Log : Responsible : Infrastructure Support Group Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : June 01, 2000 3:42:18 PM Problem Short Description : Complains about old version of Eclipse in wg5oh. Action : It should be updated from the scientific software distribution. Action Log : Responsible : Software&Commun.Supp.T. Deadline : July 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : August 05, 1999 3:12:33 PM Problem Short Description : F/35 difficult to mount after adapter modifications Action : Instrumentation carriage should be modified. Action Log : December 23, 1999 1:15:49 PM gandreon Operation can be done only when F/35 will be mounted again. New deadline required. January 25, 2000 9:38:35 AM gihle Next possible date is May 11th, 2000 January 27, 2000 1:54:37 PM gihle It was decided that the work has to be done on May 11th, 2000 February 03, 2000 3:37:05 PM gandreon To be carried out the day of the new deadline. Responsible : Mechanics Support Team Deadline : May 12, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : November 17, 1999 5:16:58 PM Problem Short Description : CES image slicers need adjustments. Action : Provide 3 micrometer screws for quantitave measure/adjustments of the 3 CES image slicers Action Log : December 02, 1999 1:39:04 PM gandreon Micrometers have been ordered. Low priority. January 13, 2000 1:18:42 PM gandreon One unit will be ready on time (High resolution slicer). January 27, 2000 1:55:57 PM gihle One unit is ready regarding mechanics. Now has to go to optics. February 17, 2000 1:29:46 PM gandreon One unit is accepted. New deadline for the second one. June 01, 2000 3:50:02 PM gandreon Unit completed. To be mounted by AGI next Monday June 5. Responsible : Mechanics Support Team Deadline : June 29, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : November 18, 1999 1:25:06 PM Problem Short Description : Delta axis encoders are exposed. Action : Mount the covers for the delta axis Action Log : November 25, 1999 12:49:36 PM gandreon A temporary protection should be installed ASAP considering the duration of this action. November 25, 1999 12:50:26 PM gandreon A temporary protection should be installed ASAP considering the duration of this action. March 09, 2000 3:22:16 PM gandreon If not completed by end of March, a plastic protection should be in place during telescope painting. April 20, 2000 8:23:25 AM gihle The work is under progress. May 11, 2000 3:38:36 PM gandreon Painted. It will be mounted tomorrow. May 18, 2000 3:55:44 PM gandreon To be mounted on June 7. June 01, 2000 3:50:51 PM gandreon New date is June 9 (Rescheduling of Timmi 2 time). Responsible : Mechanics Support Team Deadline : March 30, 2000 10:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:19:10 AM Problem Short Description : Install the continuous flow cryostat for CES Action : The existing one has to be modified. New parts have to be manufactured. Action Log : March 23, 2000 3:12:31 PM gandreon Parts are ready. To be assembled and tested. March 30, 2000 2:55:00 PM gandreon Assembled and tested by LIN. Still some details to be adjusted with L. Gonzales. April 06, 2000 3:27:27 PM gandreon Some modification still needed. April 20, 2000 8:22:30 AM gihle This TAP changed to a project, since there are other modifications in the CCD dewar that are under way. Therefore, it is recommended to split the "action" in at least two different: !) The fabrication and testing of the new transfer line, and 2) Modifications to the CCD dewar April 24, 2000 8:12:08 PM gihle New deadline agreed with the Director May 31st, 2000 May 04, 2000 5:16:37 PM gandreon Real deadline is May 22nd. LIN must coordinate the additional changes required by the new dewar/CCD. May 18, 2000 3:56:18 PM gandreon Work in progress. New CCD is being cooled down. June 01, 2000 3:56:48 PM gandreon There is a problem of consumption. Alternatives will be examined by a review panel. GIH will coordinate the review. Responsible : Mechanics Support Team Deadline : May 22, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 30, 1999 12:14:33 PM Problem Short Description : Tube against parasitic light for CES Very Long Camera Action : A tube is required for the CES VLC to baffle straylight. As was present with the old Long Camera a tube is required that contains the camera mirror and extends beyond the folding mirror to baffle light. It needs to have a provision for easy access to the Hartmann mask such as a slidable door, or equivalent. Action Log : January 13, 2000 1:26:57 PM gandreon More analisys is required. Tube may not be the best solution and it will be an heavy job. Currently the main source of parassitic light seems to have been cut (all LEDs off in Fiera). February 03, 2000 3:43:18 PM gandreon Tests performed by R Tighe were satisfactory. To be confirmed by Martin. February 10, 2000 4:22:45 PM gandreon A temporary solution has reduced parassitic light by a factor of 9. Therefore a permanent one should be devised. Deadline to be negotiated. March 02, 2000 1:51:58 PM gandreon Proposal is for end of April. March 09, 2000 3:26:07 PM gandreon Design ready. To be approved by Martin Kuster. March 16, 2000 2:08:31 PM gandreon One source of light has been descovered and eliminated shoielding the fiber carrying data to/from Fiera. Action on hold unitl confirmed by Martin that now there is no more parassitic light. April 06, 2000 3:29:52 PM gandreon Two protections have to be built, one for 45 degrees mirror and one for the grating. Deadline changed by the Director. Responsible : Mechanics Support Team Deadline : October 26, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 12, 2000 2:54:28 PM Problem Short Description : remove old atomic/cerme clock from 3p6 premises in the 3rd floor Action : Remove the rack and the electronics of the old atomic clock which is not used at the 3p6 any more. (The room is needed for setting up the MOS facility). Action Log : January 13, 2000 1:28:16 PM gandreon To be studied by ELC, in relation to existing projects on the same matter. March 03, 2000 9:22:58 AM dgojak According the SEST people informations, the CERME clock's used by them are just one display more in the control room which may be removed. Which means that CESIUM clock distribution may be intercepted at the exTRS building level and move the clock generator to ELC if required, leaving the SEST segment inactive. May 26, 2000 7:18:40 PM dgojak The CESIUM clock cell lifetime expired years ago, we don't know if we touch the clock and it stops, if it would be able to restart again. For this reason, ELC started a project building low cost GPS-driven clocks for the telescopes that still use this signal source. Once we have this alternative, and we reeplace the existent CEREME clock-displays, we will be completely independent of the old CESIUM clock. There is a second ELC project for a upgrade the CESIUM clock with a TIM-BUS protocol, this has the advantage of a second source for the NTT, at the moment there is a transmission protocol incompatibility between the different systems (IRIGB, MANCHESTER & TIM-BUS). June 01, 2000 4:03:58 PM gandreon The alternatives will be reviewed. DGO will organizing the meeting of the panel. Responsible : Electronics Support Team Deadline : July 31, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 24, 2000 6:34:58 PM Problem Short Description : Safety problem during instrument (EFOSC2) transportation. Forklift dangerous. Action : Transport carriage has to be build Action Log : May 25, 2000 4:00:27 PM gandreon Design is ready. Responsible : Mechanics Support Team Deadline : May 31, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 17, 2000 1:24:44 PM Problem Short Description : A lens is missing in the calibration unit of fiber adapter. Action : To be installed and tested before the end of May. Action Log : February 17, 2000 4:13:34 PM agilliot This lens will adapt the calibration beam Fratio to F/8 ... It was not possible to mount it before because of the requirement to obtain light over all three fiber inputs. Now only one fiber will be used and light could be concentrated on one single spot covering the selected fiber input. February 24, 2000 1:42:13 PM gandreon Final check has to be done during a set-up night, with a real star. March 09, 2000 8:53:49 AM agilliot Comment from Gae is irrelevant, it is a lens to concentrate calibration light and as nothing to see with real star. Installation acan be done any available day time. April 13, 2000 11:03:29 AM jroucher to be installed when the new slicer mount are ready (cumul of CES operations) April 27, 2000 9:35:31 AM agilliot Scheduled for next turno on beginning of May May 17, 2000 11:09:06 AM agilliot Work to be performed together with new slicer mounts mount still not ready ... planned for next turno 23-30 May 25, 2000 11:11:26 AM agilliot lens has been installed with guarantee of higher efficiency of the Th lamp. Reasons of structures found on the FF concern the lack of ground glass diffusing the light. A portion of lamp coil is imaged on the fiber input area producing the structure on the FF Responsible : Instrumentation Support Team Deadline : May 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : April 27, 2000 8:10:54 PM Problem Short Description : The actual air dryer is not sufficient to provide dry compressed air in the telescope. Action : To install a new air dryer. The installation will be related to the availability of the equipment in the market. Action Log : May 07, 2000 3:33:29 PM gihle The information and quotation is of June 1998. We are asking for a new quotation and availability of the equipment. Responsible : Mechanics Support Team Deadline : June 30, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : May 11, 2000 3:30:50 PM Problem Short Description : Long term monitoring of FIERA temperature is required. Action : Recipy for the weekly storage of temperature data should be provided to the TT. Action Log : May 30, 2000 4:11:36 PM nhaddad Working on it. It will be more difficult than thought as the PULPO server program in the SPARC doesn't support to Log Dump command. Responsible : Instrumentation Support Team Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : May 11, 2000 3:33:57 PM Problem Short Description : No place to install the new calibration lamp control box. Action : A suitable shelf should be provided. Action Log : June 01, 2000 4:05:16 PM gandreon Ready. To be installed. Responsible : Infrastructure Support Group Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : May 25, 2000 11:15:55 AM Problem Short Description : UTP5 cables to the cage are damaged. Action : They should be replaced together with the patch panels. Action Log : May 30, 2000 10:07:48 AM dgojak According to the ELC resources and with the collaboration of the 3p6 Team, the damaged cables were replaced. June 01, 2000 4:06:03 PM gandreon Done. One cable gives problems (inverted wires?). Responsible : Electronics Support Team Deadline : May 31, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : May 25, 2000 3:52:11 PM Problem Short Description : Filament image of FF lamps cause uneven light distribution. Action : Actual lamp should be replaced by the old EFOSC lamp which provides diffuse light. Action Log : May 29, 2000 4:05:11 PM gihle Please check the deadline. Responsible : Mechanics Support Team Deadline : June 04, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : May 25, 2000 3:53:42 PM Problem Short Description : Main collimator cannot be properly locked in position. Action : A new system should be installed. Action Log : Responsible : Mechanics Support Team Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 03, 2000 3:49:50 PM Problem Short Description : Telescope cannot be locked. Action : New electric locks to be installed at 2.20, 1.52, and 1.54 main access door. Action Log : February 24, 2000 1:44:53 PM gandreon Suspended at Team's request. Responsible : Infrastructure Support Group Deadline : February 28, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 03, 2000 3:51:09 PM Problem Short Description : People without key would not be able to enter telescope. Action : A telephone should be installed outside entrance door at 2.20, 1.52, and 1.54. Action Log : February 24, 2000 1:45:08 PM gandreon Suspended at Team's request. Responsible : Infrastructure Support Group Deadline : February 29, 2000 4:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : April 14, 2000 12:25:42 PM Problem Short Description : Dismount and inspect preload gearbox. Action : In the first week of May, MEC should dismount the gearbox that is supected to cause the 20" jumps. The unit should be inspected and cleaned, and remounted *the same day* (we have no idle time). If extensive maintenance of the gearbox is required, a new AP will be opened for the June idle time. Action Log : May 11, 2000 3:41:21 PM gandreon To be done next week. May 16, 2000 5:37:47 PM gihle The operation to dismount and to change oil of the preloading cyclo unit can be done in the day, but a thorough inspection, including a complete dismounting of the unit, needs more time. As we do not have the necessary time now, we have decided that it is recommended to make this work starting the 13th of June. If it takes longer than expected we can use one night, and we are certain to make a proper work. May 18, 2000 4:00:41 PM gandreon It will be done during idle time. May 25, 2000 4:03:09 PM gandreon Work will start on June 13th. Responsible : Mechanics Support Team Deadline : June 15, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : April 27, 2000 8:22:51 PM Problem Short Description : The difficulty to control the crane with the actual manual handset, specially when the dome rotates. Action : To activate a remote control system for the 2.2m dome crane. Action Log : May 31, 2000 11:33:11 AM gihle The remote control was activated and tested. Responsible : Infrastructure Support Group Deadline : July 30, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : May 25, 2000 3:50:21 PM Problem Short Description : One filter was not properly measured. Action : It should be measured again. Action Log : Responsible : Instrumentation Support Team Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : DAN 154 Create-date : April 13, 2000 4:29:16 PM Problem Short Description : To improve the acquisition system Action : To install an offset factor for the slit wheel in the acquisition system Action Log : April 24, 2000 8:20:14 PM gihle New deadline agreed with the Director May 30, 2000 May 04, 2000 5:22:43 PM gandreon Instructions for the testing are needed. Responsible : Software&Commun.Supp.T. Deadline : May 30, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : DAN 154 Create-date : May 04, 2000 5:07:06 PM Problem Short Description : Stray light coming from slit is affecting Flat Fields during daytime. Action : Dome should be made reasonably light-tight. The rubber on the slit should be overhauled. Action Log : June 01, 2000 4:11:27 PM gandreon Emanuela Pompei wrote: as preliminary criterion for light tightness for the danish dome, I would say that if I take I a 5min I band FF with mirror and shutter open and no light on, I should get something of the order of the bias level (1200 ADU) and not a good flat (like it is now, 30.000 ADUs). Responsible : Mechanics Support Team Deadline : May 30, 2000 11:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : DAN 154 Create-date : May 11, 2000 3:35:04 PM Problem Short Description : Calibration frames are not protected from user action. Action : A protected directory, accessible for modifications to team members only, should be created. Calibration frames and small operational batches will be stored there. General users should be able to read/execute only. Action Log : Responsible : Software&Commun.Supp.T. Deadline : May 18, 2000 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 152 Create-date : April 04, 2000 2:06:14 AM Problem Short Description : Analog switch hungs up when there are electrical interferences. Action : A better filtering for the electronic rack in the E1p52 dome is needed to prevent electronic interference. Action Log : April 27, 2000 8:03:53 PM gihle It was informed that this TAP is more likely a project, so a proposal will be presented the next meeting. May 30, 2000 10:34:29 AM dgojak Discussing this issue with MMO, one tentative solution will be to insert filters at the respective control lines. This task will be carried out according the telescope availability, and in collaboration with the MET team. June 01, 2000 4:14:46 PM gandreon It seems that much more effective modification can be done in the installation by MET. MMO will explain these modifications to ROL. Point closed no action. Responsible : Electronics Support Team Deadline : May 15, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 152 Create-date : April 27, 2000 8:14:49 PM Problem Short Description : The unfriendly type of handset of the dome´s crane. Action : New handset for the 1.52m dome crane. Action Log : Responsible : Infrastructure Support Group Deadline : July 30, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : May 04, 2000 5:09:30 PM Problem Short Description : Spares and documentation for TCS are in poor state. Action : To support the Telescope Team in its task of achieving a full set of tested spare parts. First step is a list of missing/faulty parts. Related documentation has also to be retrieved and put in order. Action Log : May 30, 2000 10:20:32 AM dgojak ELC will provide all the necessary support, according its resources and considering the current commitments. Responsible : Electronics Support Team Deadline : June 28, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : May 11, 2000 3:25:53 PM Problem Short Description : COMBI gives problems. Action : SWC should help the TT in debugging and correcting the problem. Action Log : Responsible : Software&Commun.Supp.T. Deadline : June 14, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : May 11, 2000 3:29:20 PM Problem Short Description : Calibration frames are not protected from user action. Action : A protected directory, accessible for modifications to team members only, should be created. Calibration frames and small operational batches will be stored there. General users should be able to read/execute only. Action Log : Responsible : Software&Commun.Supp.T. Deadline : May 18, 2000 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DUTCH Create-date : May 18, 2000 3:50:23 PM Problem Short Description : Acquisition system is no longer there. Action : Workstation has to be taken back and reconfigured. Action Log : Responsible : Software&Commun.Supp.T. Deadline : May 30, 2000 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : GENERAL Create-date : August 05, 1999 1:15:17 PM Problem Short Description : Encoders installations Action : It is necessary to make a encoders support for the 11 inch celestron telescope ( GMS ). Action Log : December 02, 1999 1:47:31 PM gandreon Design ready. Lowest priority for construction. January 06, 2000 3:17:28 PM gandreon Deadline changed. Responsible : Mechanics Support Team Deadline : August 30, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : October 18, 1999 2:39:31 PM Problem Short Description : The fixation of CCD to th Tinsley Interferometer is not optimal. Action : It should be improved. Action Log : December 02, 1999 1:59:11 PM gandreon Lowest priority. Responsible : Mechanics Support Team Deadline : August 30, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : March 09, 2000 3:07:27 PM Problem Short Description : Power supply of the Edwards plant is malfunctioning. Action : An overhaul is needed. Action Log : March 23, 2000 11:26:22 AM dgojak There are two problems. the first, related to the power control, was solved by MMO and is under test. The second is related to a high current lack (~80 Amps) which activates the overcurrent protection that turns the system into inoperative. The originn of this problem could not certainly be detected yet, due to that we are checking and discarding one by one the different components involved in the circuit. March 23, 2000 5:05:12 PM mmornhin The current leak was traced to the filament selector switch, a large pneumatic device. The problem appears mostly with filament #3. Checking this switch requires disassembling much of the plant. Leo will do this next turno. Up to now, 4 different things have been done to the controller: 1) Repair of the meter's moving coil. As the feedback goes through the meter (!), this failure had opened the feedback loop, leading to the destruction of several components, which were replaced. 2) Design modification to provide proper overcurrent protection. The original circuit was nonfunctional because of misdesign (not taking into account normal component tolerances). 3) Addition of a simple filter to improve transient tolerance by the SCRs. 4) Increase of the dead-time in the phase control circuit, to prevent false firing of the SCRs. At this time the plant COULD be used, by skipping filament #3, but it's better not to do so until the selector switch has been repaired. Using it in the present condition may cause further damage. April 06, 2000 3:36:41 PM gandreon Reassigned to criogenics. April 13, 2000 4:37:59 PM gihle The unit was disassembled and found that one tiristor was damaged. The tiristor was order by Electronic team and the delivery time is expected in 15 days. The solution is in hands of Electronic Team, so it should be re-assigned to the ELC team. May 04, 2000 5:25:06 PM gandreon Reassigned tol ELC. Deadline will be assigned when the device arrives to the mountain. Responsible : Electronics Support Team Deadline : April 12, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : April 06, 2000 3:19:36 PM Problem Short Description : IRAF in Linux boxes is not Y2K compliant. Action : Patch them. Action Log : May 04, 2000 5:26:30 PM gandreon Patch has been installed at DAN 154. For other boxes, it will come with the next release of Scientific Software Distribution (end of May). May 27, 2000 11:49:17 AM jibsen Percy Glaves got in contact with Richard Hook and the latest version of scisoft has been delayed until middle June. Since we cannot even start without the official scisoft distribution I suggest to delay the deadline in 1 month (July 15). June 01, 2000 4:21:24 PM gandreon New deadline due to late arrival of package. Responsible : Software&Commun.Supp.T. Deadline : July 06, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : April 12, 2000 6:55:15 PM Problem Short Description : Order inside the Satellite Antena Control Room Action : 1) Remove an unused rack. 2) Remove old equipment. 3) Rearrange spare parts, signal monitor oscilloscope, VT100 monitor, documentation and spare parts. Flavio Gutierrez Action Log : April 15, 2000 11:27:52 AM dgojak Ok, We took notice of it. Is in the que ELC queue acoording priorities and resources. May 11, 2000 3:45:18 PM gandreon New deadline accepted (It was mid May) Responsible : Electronics Support Team Deadline : May 31, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : April 27, 2000 8:07:58 PM Problem Short Description : MOS punching machine gives problems in NTT and 3.6m. Action : Although it seems to be a software problem, the first study will be performed by the Electronic Team. Action Log : Responsible : Electronics Support Team Deadline : May 30, 2000 12:00:00 AM Deadline Status : Overdue ________________________________________________________________________________ Telescope : GENERAL Create-date : May 18, 2000 3:51:10 PM Problem Short Description : The snow detector did not work. Action : A solution should be devised and implemented. Action Log : May 25, 2000 4:05:33 PM gandreon The firm who delivered the antenna has been contacted. May 30, 2000 10:14:15 AM dgojak Evaluating different alternatives, its complexity vs. reliability, ELC proposes a remote control for the heating system that could be activated via modem by an operator. June 01, 2000 4:23:04 PM gandreon A system which does not rely on human intervention is required. Possible combination of sensors (temperature + humidity) should be also investigated. Responsible : Electronics Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : May 18, 2000 3:52:21 PM Problem Short Description : Many offices in A&A do not have anymore lighttigh curtains. Action : Black curtains should be overhauled. Action Log : May 25, 2000 4:13:58 PM gandreon Missing curtains (360, MET offices) have to be reinstalled! Responsible : Infrastructure Support Group Deadline : July 29, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : June 01, 2000 3:39:33 PM Problem Short Description : VLT lab has been moved to another office. Action : The fiber optic should be moved too. Action Log : Responsible : Infrastructure Support Group Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : June 01, 2000 3:43:43 PM Problem Short Description : Lot of dust has been noticed in telescopes. It may be due to the park in front of Dormitories 1 and 2. Action : Surface should be sealed. Action Log : Responsible : Infrastructure Support Group Deadline : June 07, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________