Generated by ARS on February 17, 2000 3:55:22 PM ACTION ITEMS LIST FOR SUPPORT TEAMS AND INFRASTRUCTURE Telescope : ESO NTT Create-date : October 27, 1999 5:24:56 PM Problem Short Description : A 100MB ethernet connection between basement and telescope is needed. Action : A short term solution (Optical coupler will be available only in mid-2001) should be provided together with cost estimation and specifications (like how many turns can the fiber be safely twisted. A minimum of 24 turns is desirable). Action Log : January 24, 2000 6:45:07 PM weckert new deadline requested February 10, 2000 4:16:44 PM gandreon A solution has been devised. Since it requires extensive mechanical work, this point has been reassigned to MEC with a new deadline. Responsible : Mechanics Support Team Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : December 27, 1999 5:18:52 PM Problem Short Description : Support for anemometer Action : A support is needed to install an anemometer just under the M3 spider, in the "Cassegrain" hole of M1. Action Log : January 26, 2000 7:40:30 AM gihle The support is ready for installation. Responsible : Mechanics Support Team Deadline : January 30, 2000 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : January 13, 2000 7:45:01 AM Problem Short Description : Special filters will be used at SUSI2 - mounting ring are needed Action : Manufacture of: 2 adapter rings for 90mm filters into 100mm SUSI2 filter cells. 2 adapter rings for 60mm filters into 100mm SUSI2 filter cells. Action Log : February 17, 2000 1:27:01 PM gandreon To be anodized. Responsible : Mechanics Support Team Deadline : March 19, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : January 24, 2000 10:35:44 PM Problem Short Description : NTT TCS Panel Action : complete the modifications and installation of the new TCS panel Action Log : February 03, 2000 3:35:24 PM gandreon Ready for commissioning. Responsible : Software&Commun.Supp.T. Deadline : January 31, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : January 24, 2000 10:57:10 PM Problem Short Description : Flat Field Lamp control Action : A set of commands and a control panel should be created, to control the flat field lamps that will be controled by one of the existing LCUs. The action requested is to prepare a "Preliminary Design" for this. SWC already received a general description of what is needed. Technical details will follow soon. Action Log : Responsible : Software&Commun.Supp.T. Deadline : February 20, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 10, 2000 4:13:55 PM Problem Short Description : Image quality software is not implemented in guideprobes. Action : A preliminary analysis and desygn should be carried out in view of future implementation (possibly by June) Action Log : Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 10, 2000 4:14:58 PM Problem Short Description : Guideprobes #2 cannot be used. Action : The complete control software for these guideprobes should be implemented, possibly by October. Action Log : Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 16, 2000 10:38:29 PM Problem Short Description : SuSI CCD decontamination Action : SuSI's chip is still very contaminated, and the Flat Field structure is still evolving. A decontamination, as done for FORS and WFI, should be performed on SuSI's dewar and chips Action Log : February 17, 2000 1:27:33 PM gandreon To be planned with ODT Garching. Responsible : Instrumentation Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 16, 2000 10:39:49 PM Problem Short Description : SuSI's M4 is still vignetting Action : M4 is still causing some vignetting on the CCD; this mirror is not moving far enough in the beam. Action Log : February 17, 2000 1:28:13 PM gandreon To be done together with the decontamination. Responsible : Instrumentation Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : February 16, 2000 10:41:02 PM Problem Short Description : Clean up Remedy problem list Action : On the 64 pending problems at NTT, 33 belong to SWC. Several of them are solved, several more are related. Pls clean up. Action Log : Responsible : Software&Commun.Supp.T. Deadline : February 23, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : August 05, 1999 3:12:33 PM Problem Short Description : F/35 difficult to mount after adapter modifications Action : Instrumentation carriage should be modified. Action Log : December 23, 1999 1:15:49 PM gandreon Operation can be done only when F/35 will be mounted again. New deadline required. January 25, 2000 9:38:35 AM gihle Next possible date is May 11th, 2000 January 27, 2000 1:54:37 PM gihle It was decided that the work has to be done on May 11th, 2000 February 03, 2000 3:37:05 PM gandreon To be carried out the day of the new deadline. Responsible : Mechanics Support Team Deadline : May 10, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : November 17, 1999 5:16:58 PM Problem Short Description : CES image slicers need adjustments. Action : Provide 3 micrometer screws for quantitave measure/adjustments of the 3 CES image slicers Action Log : December 02, 1999 1:39:04 PM gandreon Micrometers have been ordered. Low priority. January 13, 2000 1:18:42 PM gandreon One unit will be ready on time (High resolution slicer). January 27, 2000 1:55:57 PM gihle One unit is ready regarding mechanics. Now has to go to optics. February 17, 2000 1:29:46 PM gandreon One unit is accepted. New deadline for the second one. Responsible : Mechanics Support Team Deadline : June 29, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : November 17, 1999 5:21:23 PM Problem Short Description : Alfa axis encoders are exposed. Action : Mount the covers for the alfa axis Action Log : December 09, 1999 1:03:14 PM gandreon Existing cover is too heavy. A new, lighter one should be manufactured. A new deadline was requested. Responsible : Mechanics Support Team Deadline : January 30, 2000 10:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 360 Create-date : November 18, 1999 1:25:06 PM Problem Short Description : Delta axis encoders are exposed. Action : Mount the covers for the delta axis Action Log : November 25, 1999 12:49:36 PM gandreon A temporary protection should be installed ASAP considering the duration of this action. November 25, 1999 12:50:26 PM gandreon A temporary protection should be installed ASAP considering the duration of this action. Responsible : Mechanics Support Team Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:17:01 AM Problem Short Description : CFA storage Action : built and install the Cassegrain Fibre Adaptor holder required for storage&off-line calibrations in the cage Action Log : January 13, 2000 1:20:14 PM gandreon Deadline changed. January 27, 2000 1:56:59 PM gihle Mechanics is ready. It is necessary to clean the area where it will be installed. February 17, 2000 1:30:17 PM gandreon A rack has to be moved. New deadline. Responsible : Mechanics Support Team Deadline : March 14, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:18:06 AM Problem Short Description : cover for CES needed Action : adapt/redesign a cover for the prism part of the CES Action Log : January 25, 2000 2:17:22 PM weckert The cocer will be made of three perts. the first part is done and inatalled.the second part is designed and the thirdone is under work. Responsible : Mechanics Support Team Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:19:10 AM Problem Short Description : Install the continuous flow cryostat for CES Action : The existing one has to be modified. New parts have to be manufactured. Action Log : Responsible : Mechanics Support Team Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:21:09 AM Problem Short Description : redesign of CES main collimator flip-mirror needed Action : the reproducibilty of path changes when turning the collimator mirror is insufficient. It needs to be manufactured according to a new design. Action Log : February 10, 2000 4:19:32 PM gandreon This is a project, to be reviewed the usual way. The requester should start the procedure writing a requirement docuement. Responsible : Mechanics Support Team Deadline : April 29, 2000 10:00:00 PM Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 01, 1999 10:25:14 AM Problem Short Description : CES exposure meter may be damaged by room illumination. Action : A security mechanism to protect the CES exposuremeter-phototube should be provided. Action Log : December 09, 1999 1:05:13 PM gandreon An interlock will be put on the room lights, while a prototype is being developed. January 06, 2000 3:09:34 PM dgojak January 06, 2000 17:15:00 dgojak A preliminary protection has been installed, e.g., once powered the phototube the room illumination is disabled. The electronic tube protection shall be ready for middle February. January 13, 2000 1:23:42 PM gandreon Prototype will be installed and calibrated during the set-up night. February 17, 2000 1:31:20 PM gandreon Probelms with the shutter prevented the device from being tested. Responsible : Electronics Support Team Deadline : February 11, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 16, 1999 4:20:36 PM Problem Short Description : graphics resources insufficient on xt43p6 (IP: 134.171.121.23) Action : replace the graphics adapter or enhance the memory. Buy from WP643. Reasons: 1) ximtool allocates colors from the desktopm, and renders the other windows unreadable. 2) P2PP tends to freeze and crash Action Log : January 06, 2000 3:12:44 PM gandreon On hold. Further study required. January 27, 2000 2:00:31 PM gihle According to SWC these two programs can not work together, they need 2 terminals. However, P.Leisy asked to try with another Xterminal before any other action. February 10, 2000 4:21:05 PM gandreon A check should be carried out i n Vitacura, to see if a different X-Terminal does not cause the same problem. Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 23, 1999 1:09:57 PM Problem Short Description : A new TCCD has to be mounted. Action : Software control program has to be reconfigured. To be done at first technical night. Action Log : January 07, 2000 4:01:21 PM jibsen Please inform SWC the next technical night to coordinate the reconfiguration. February 03, 2000 3:40:07 PM gandreon Deadline changed to 10 (instead of 8) due to posponement of EFOSC installation. February 13, 2000 2:33:52 PM jargomed Technical CCD configured and new version installed and archived. Responsible : Software&Commun.Supp.T. Deadline : February 09, 2000 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 23, 1999 1:12:15 PM Problem Short Description : Low resolution slicer not mounted. Action : To be installed. Action Log : February 03, 2000 3:42:04 PM gandreon It should be done at the beginning of the run, before February 13. To be coordinated with Martin. February 17, 2000 1:33:24 PM gandreon A new housing (3rd generation, with micrometer) has to be prepared. New Deadline. Responsible : Instrumentation Support Team Deadline : June 29, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : December 30, 1999 12:14:33 PM Problem Short Description : Tube against parasitic light for CES Very Long Camera Action : A tube is required for the CES VLC to baffle straylight. As was present with the old Long Camera a tube is required that contains the camera mirror and extends beyond the folding mirror to baffle light. It needs to have a provision for easy access to the Hartmann mask such as a slidable door, or equivalent. Action Log : January 13, 2000 1:26:57 PM gandreon More analisys is required. Tube may not be the best solution and it will be an heavy job. Currently the main source of parassitic light seems to have been cut (all LEDs off in Fiera). February 03, 2000 3:43:18 PM gandreon Tests performed by R Tighe were satisfactory. To be confirmed by Martin. February 10, 2000 4:22:45 PM gandreon A temporary solution has reduced parassitic light by a factor of 9. Therefore a permanent one should be devised. Deadline to be negotiated. Responsible : Mechanics Support Team Deadline : March 22, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 12, 2000 2:52:19 PM Problem Short Description : UPS problems can go unnoticed Action : install an alarm in case the central UPS goes off-line via autodialing ISG/electricans. Action Log : January 24, 2000 6:48:25 PM weckert Waiting for an alarm system Responsible : Deadline : March 31, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 12, 2000 2:54:28 PM Problem Short Description : remove old atomic/cerme clock from 3p6 premises in the 3rd floor Action : Remove the rack and the electronics of the old atomic clock which is not used at the 3p6 any more. (The room is needed for setting up the MOS facility). Action Log : January 13, 2000 1:28:16 PM gandreon To be studied by ELC, in relation to existing projects on the same matter. Responsible : Electronics Support Team Deadline : March 31, 2000 12:00:00 AM Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 12, 2000 2:57:56 PM Problem Short Description : refurbish the toilett in the 3rd floor of the 3p6 building Action : This room is in an embarassing state. It should be renovated, and equipped with a new sink and toilett, as well as freshly tiled. Action Log : Responsible : Infrastructure Support Group Deadline : February 29, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 13, 2000 7:49:27 AM Problem Short Description : 100 new MOS plates needed Action : pls proved 100 blacked MOS plates Action Log : January 13, 2000 1:29:52 PM gandreon MEC may have still some, but they have to be provided by CFT. Deadline will be assigned when plates arrive. January 24, 2000 6:52:27 PM weckert 40 plares are delivered February 17, 2000 1:34:28 PM gandreon PR has been issued. Responsible : Mechanics Support Team Deadline : January 31, 2000 12:00:00 AM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 360 Create-date : January 24, 2000 6:34:58 PM Problem Short Description : Safety problem during instrument (EFOSC2) transportation. Forklift dangerous. Action : Transport carriage has to be build Action Log : Responsible : Mechanics Support Team Deadline : May 31, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 03, 2000 3:53:06 PM Problem Short Description : Missing parameter in FITS header. Action : Rotator position (ins.opti2.pos) should be added. Action Log : February 03, 2000 3:55:05 PM gandreon It should be done after approval from M Sterzik, and before March 30. Responsible : Software&Commun.Supp.T. Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 09, 2000 6:48:44 PM Problem Short Description : Reasonable telescope SW limits needed Action : Preliminary test of the telescope SW limits according to the user requirement specifications: The criterium should be 75deg zenith distance to activate the software limits (msterzik). Action Log : February 13, 2000 2:43:13 PM jargomed Major software changes are required (not just database values change). The solution will be extend the actual axes limits and a monitoring mechanism will be implemented on the WS code to take care of the zenith distance limit, the drawback is that it'll depend on the WS but no reliable software limit will exists when using the axis as standalone. Preliminary feasibilty and implementation tests planned for the next technical time in March. February 17, 2000 1:37:03 PM gandreon In the meantime, current alfa and delta axis limits should be given larger values, near the hardware limit. Responsible : Software&Commun.Supp.T. Deadline : March 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 17, 2000 1:23:34 PM Problem Short Description : A second fiber head has to be stored. Action : An additional storage box has to be prepared. Action Log : Responsible : Mechanics Support Team Deadline : May 17, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 17, 2000 1:24:44 PM Problem Short Description : A lens is missing in the calibration unit of fiber adapter. Action : To be installed and tested before the end of May. Action Log : Responsible : Instrumentation Support Team Deadline : May 30, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : February 17, 2000 1:25:52 PM Problem Short Description : The second slicer does not perform as the one recently adjusted. Action : The same focus procedure has to be applied. Action Log : Responsible : Instrumentation Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : December 22, 1999 10:20:58 AM Problem Short Description : unable to reduce WFI data Action : Please install latest version of IRAF MSCRED+ESOWFI packages. Please do this in collaboration with Heath Jones, who has instructions from IRAF/NOAO. Action Log : January 27, 2000 2:03:25 PM gihle MSCRED+ESOWFI need to be the latest version, which is not the actual case. February 17, 2000 1:38:25 PM gandreon Currently installed MSCRED and ESOWFI packages are not the latest version. Responsible : Software&Commun.Supp.T. Deadline : January 05, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : January 06, 2000 3:06:00 PM Problem Short Description : Failure in air compressor affects image quality. Action : - A switching system between the two compressor should be installed for automatic back-up in case of failure. - A logging facility should be installed in order to monitor the pressure. Action Log : January 27, 2000 2:05:23 PM gihle A proposal was presented by H.Kastowsky and discussed with E.Pompei and G.Ihle. It was accepted and it will be done. February 10, 2000 4:24:11 PM gandreon Hans did it at the end. Responsible : Mechanics Support Team Deadline : March 30, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : January 24, 2000 6:37:44 PM Problem Short Description : N2 system leaks Action : Repair of Hoses and nipples Action Log : January 26, 2000 6:16:54 AM gihle The N2 leaks were repaired; the one at the instrument entrance and at the telescope´s base. January 27, 2000 2:08:11 PM gihle The two nipples that connect the solenoid valve and the rubber hoses as well as the fittings that connect the bottles with the N2 lines have to changed. Responsible : Mechanics Support Team Deadline : February 15, 2000 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 03, 2000 3:49:50 PM Problem Short Description : Telescope cannot be locked. Action : New electric locks to be installed at 2.20, 1.52, and 1.54 main access door. Action Log : Responsible : Infrastructure Support Group Deadline : February 28, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 03, 2000 3:51:09 PM Problem Short Description : People without key would not be able to enter telescope. Action : A telephone should be installed outside entrance door at 2.20, 1.52, and 1.54. Action Log : Responsible : Infrastructure Support Group Deadline : February 29, 2000 4:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 03, 2000 3:51:56 PM Problem Short Description : Observer requires a special mask for WFI Action : To be manufactured. Action Log : Responsible : Mechanics Support Team Deadline : February 04, 2000 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 10, 2000 2:04:23 PM Problem Short Description : Modification to startup script needed. Action : Modify startup script as requested (details in mail to J.Ibsen). Action Log : February 17, 2000 1:40:18 PM gandreon Firewall will be configured when a router will be installed, with the new Gigabit backbone. Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : February 10, 2000 4:12:06 PM Problem Short Description : Lamps in corridor and staircase burn out because they are left on. Action : A timer should be installed, possibly for up to 15 miniutes. Action Log : Responsible : Infrastructure Support Group Deadline : March 01, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : October 21, 1999 1:42:26 PM Problem Short Description : Maintenance on slit will prevent any observation. Action : A spare piece with reflecting mirror should be manufactured in order to replace the slit when maintenance is requested. In this way Feros could still be usable. Action Log : November 04, 1999 1:29:11 PM gandreon Should be done during Feros time ( November 9 to 24). Possibly finished a couple of days in advance (22/11). November 18, 1999 1:37:14 PM gandreon It will not be finished in time. The foreseen maintenance should be done during daytime. January 13, 2000 1:45:01 PM gandreon To be delired this turno. February 03, 2000 3:45:44 PM gandreon Test to be carried out between February 14 and 18. February 17, 2000 1:41:41 PM gandreon Nothing was done. Responsible : Mechanics Support Team Deadline : November 21, 1999 10:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 152 Create-date : November 11, 1999 1:10:37 PM Problem Short Description : Feros calibration lamp filter has to be removed from time to time. Action : A filter holder with two positions (one for the filter and one empty) should be prepared. Action Log : February 17, 2000 1:42:25 PM gandreon One month more is needed. Responsible : Mechanics Support Team Deadline : February 14, 2000 10:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : GENERAL Create-date : August 05, 1999 1:15:17 PM Problem Short Description : Encoders installations Action : It is necessary to make a encoders support for the 11 inch celestron telescope ( GMS ). Action Log : December 02, 1999 1:47:31 PM gandreon Design ready. Lowest priority for construction. January 06, 2000 3:17:28 PM gandreon Deadline changed. Responsible : Mechanics Support Team Deadline : February 28, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : October 18, 1999 2:39:31 PM Problem Short Description : The fixation of CCD to th Tinsley Interferometer is not optimal. Action : It should be improved. Action Log : December 02, 1999 1:59:11 PM gandreon Lowest priority. Responsible : Mechanics Support Team Deadline : February 28, 2000 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : November 25, 1999 12:46:34 PM Problem Short Description : TIM signal is needed in SWC development lab. Action : A fiber optic connection should be established between NTT and A&A building for the TIM signal. Action Log : December 23, 1999 1:18:52 PM gandreon Material has just arrived. January 06, 2000 2:56:19 PM dgojak The fiber has been installed, it is pending to check the attenuation. Responsible : Electronics Support Team Deadline : December 21, 1999 10:00:00 PM Deadline Status : Closed with Delay ________________________________________________________________________________ Telescope : GENERAL Create-date : December 23, 1999 1:13:13 PM Problem Short Description : Support Team do not reassign problems back to telescope Teams. Action : Weekly notification to be issued by an escalation. Action Log : Responsible : LS Management Deadline : January 12, 2000 10:00:00 PM Deadline Status : Closed with Delay ________________________________________________________________________________ Telescope : GENERAL Create-date : January 19, 2000 10:00:47 AM Problem Short Description : Platform extension at south of admin building. Action : Construct a 2x3 meters concrete extension to facilitate the load of delicate equipment (computers and periphericals). Action Log : Responsible : Infrastructure Support Group Deadline : April 30, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : January 19, 2000 10:02:43 AM Problem Short Description : Computer users room painting. Action : Paint and repair North and West walls of user room at the support computer center. Suggested deadline by mid-April. Action Log : Responsible : Infrastructure Support Group Deadline : April 30, 2000 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : January 24, 2000 6:41:52 PM Problem Short Description : No access to weekly reports from year 2000 in epu. Action : Add at least a couple of years to the selector. Query page developed by Marcus Pavez. Action Log : Responsible : Software&Commun.Supp.T. Deadline : February 23, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : January 27, 2000 2:16:37 PM Problem Short Description : To connect the Vertex antenna with the conference room. Action : To install the optical fiber that connects the Vertex antenna with the Conference Room Action Log : Responsible : Electronics Support Team Deadline : March 29, 2000 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________