Generated by ARS on 28 de May de 1999 8:25:55 AM ACTION ITEMS LIST FOR SUPPORT TEAMS AND INFRASTRUCTURE Telescope : ESO NTT Create-date : 5 de November de 1998 12:46:23 PM Problem Short Description : There is condensation on the front window of SOFI under certain conditions. Action : Mechanical modification to the cover in front of the window may solve the problem. The problem is urgent since this is the period of the year that is most affected by condensation. We need a solution as soon as possible. Please move back the deadline! Action Log : 30 de December de 1998 12:43:50 PM gandreon Problem became urgent due to atmosferic conditions during summer. A prompt delivery is required by the TT. 7 de January de 1999 12:59:16 PM gandreon It only affect SOFI because SUSI has its own system (N2). 15 de April de 1999 5:51:49 PM weckert All parts are manufactured. During next turno the unit will be anodized and assembled and can be mounted in front of the SOFI window. 13 de May de 1999 4:29:51 PM gandreon To be installed on May 18-23. 20 de May de 1999 3:03:11 PM gandreon To be completed by June 30. Responsible : Mechanics Support Team Deadline : 31 de March de 1999 12:00:00 AM Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO NTT Create-date : 26 de December de 1998 2:38:33 AM Problem Short Description : SofI's CCC needs protection against power and A/C failure Action : Every time there is a power cut and/or an air conditioning failure, SofI's CCC stops. As these events are quite common, and the manual is too heavy for the quick reaction requested, the INC will provide: - Simplified check lists for most common events. - Training to NTTT operational people and to detector technicians. Action Log : 22 de February de 1999 10:30:23 AM uweilenm A new training will be organized in March for both turnos. 11 de March de 1999 1:00:08 PM gandreon Preparation of the condensed manual is being delayed. New deadline was agreed. 1 de April de 1999 12:49:44 PM gandreon Manual has been delivered. Training has been posponed to May. Responsible : Instrumentation Support Team Deadline : 30 de May de 1999 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 20 de January de 1999 9:23:25 PM Problem Short Description : Boxes needed for filters Action : Almost one year ago , we requested filter boxes for EMMI and SUSI2 in an action point meeting. We were told that - workshop was too workloaded - the kind of boxes we always used until now at NTT are unnecessarily expensive and that it should be possible to buy some from a catalog . We therfore got a catalog from W. Eckert and after agreeing with Alain Giliotte we ordered 20 units of the model which better looked to fit our needs FOR TEST. It appears CLEARLY that these boxes are very cumbersome and even dangerous to contain filters, specially DM 8000 ones. So we still do not have a safe filter storing solution at NTT. Our ideal solution is to get maufactured manufactured anywhere 15 susi2 filter boxes ( 9 filters to arrive this year ) 5 emmi filte boxes ( spares ) 10 transparent lids ( to replace opaque emmi lids) The models we have in use now are satisfacory except opaque emmi and a little shape detail on susi2 lids. Action Log : 3 de February de 1999 2:09:13 PM gihle The time required to manufacture these boxes is : - To make the filter boxes, SUSI2 or EMMI : 3.5 hours each box plus cover. Total: 70 hours. - To make the transparent covers : 2 hours each. Total : 20 hours All material must be ordered under NTT budget. 11 de February de 1999 12:57:29 PM gandreon It will be carried out as background job. Few boxes are supposed to be delivered fairly soon. 7 de April de 1999 5:36:22 PM gihle Material for the fabrication has been ordered. We have not received it yet. 15 de April de 1999 5:53:33 PM weckert The material did not yet arrive in Chile 22 de April de 1999 3:32:03 PM weckert Material has arrived. Fabrication will start as soon as possible. 29 de April de 1999 4:21:08 PM gandreon The prototype is ready. 20 de May de 1999 3:05:01 PM gandreon Twenty boxes are ready. Responsible : Mechanics Support Team Deadline : 30 de July de 1999 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 25 de March de 1999 12:53:44 PM Problem Short Description : Slit is not waterproof. Action : After a visual inspection the apertures should be closed. Finally a test should be performed. Action Log : 8 de April de 1999 4:47:35 PM gihle ISG will work next week 15 de April de 1999 5:55:05 PM weckert The ISG will make the final test tomorrow (16.04.99) 22 de April de 1999 3:33:51 PM weckert ISG made the tests and found the where the roof was leacking.This part of the problem was solved, but the side seal of the slit is still to be fixed. Material will be ordered. 3 de May de 1999 3:23:55 PM gihle The rubber to be used as spacer for a good seal has been ordered. 6 de May de 1999 2:56:12 PM gandreon New deadline agreed. 13 de May de 1999 4:58:27 PM gandreon At the latest it will be completed by May 19, 1999. 20 de May de 1999 3:04:17 PM gandreon O.Varas (the dome mechanic) was not present due to family problems. 27 de May de 1999 4:31:59 PM gandreon Work will start next Monday Responsible : Mechanics Support Team Deadline : 15 de May de 1999 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 8 de April de 1999 4:51:17 PM Problem Short Description : It is necessary to re-arrange the computers cabling. Action : To switch-off all workstations during the cleaning operation Action Log : 29 de April de 1999 4:22:19 PM gandreon It was not done to Percy's illness. New deadline agreed. Responsible : Software&Commun.Supp.T. Deadline : 15 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 22 de April de 1999 4:06:22 AM Problem Short Description : Replace damaged + clean surviving "Dycem" floor Action : The stairs and part of the instrument rooms are covered with "Dycem" plastic mats (to trap dust). Part of these are damaged (instrument rooms) and should be replaced (by larger area, typically 2x2m). Additional mats should be installed in front of the tel-> instr. doors. The staircase mats should be thoroughly cleaned (DyClean, white spirit or isopropyl). Action Log : 6 de May de 1999 2:57:18 PM gandreon Waiting for material, to be ordered in Germany. 13 de May de 1999 4:59:17 PM gandreon TT complains that cleaning was inadequate. 24 de May de 1999 3:05:00 PM gandreon - The cleaning has now been thoroughly performed. That part of the AP can be considered as closed with NTT's satisfaction. - We received a quote for replacement of damaged DYCEM floor. The price quote is terribly expensive (10 000 DM for 12 m^2). Therefore, we will NOT pursue in this way. I want to request instead a weekly cleaning of the instrument and telescope rooms (i.e. better cleaning than what is done now). In conclusion, this point can be closed. Responsible : Infrastructure Support Group Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO NTT Create-date : 22 de April de 1999 4:32:53 PM Problem Short Description : The two openings in the dome's floor close to the telescope, are blowing hot air. Action : To study the functioning of these openings and to provide a solution to the problem. Action Log : 29 de April de 1999 4:24:26 PM gandreon IR camera is required for the tuning of the fan speed. New deadline agreed. 3 de May de 1999 3:16:27 PM gihle A test was performed with the correct fan speed (no IR camera), and it was seen that the two openeings are sucking air (..the old paper test...). The night operator knows that during night observations the fan should be placed at high speed. 27 de May de 1999 4:33:00 PM gandreon Waiting for IR camera. Responsible : Mechanics Support Team Deadline : 30 de June de 1999 11:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 29 de April de 1999 10:24:29 AM Problem Short Description : Temperature in M1, M2, M3 lcu's racks is too high Action : Increase the air extraction flow on the miniracks (M1 M2 M3) such a way that heat is removed efficiently through the extraction hoses, avoiding the influence of these units on the dome seeing. Action Log : 13 de May de 1999 5:00:20 PM gandreon New deadline has been agreed because fans have to be changed. Responsible : Mechanics Support Team Deadline : 15 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 8 de May de 1999 5:01:15 PM Problem Short Description : Lamp indicator is needed on Sofi OS panel. Action : we need an indicator on the main SofI OS panel, showing whether calibration lamps are ON or OFF. Currently, this is visible only in the calibratin lamp panel, which is usually not open. Action Log : 13 de May de 1999 5:04:39 PM gandreon Suggested deadline: end of July. Responsible : Software&Commun.Supp.T. Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 13 de May de 1999 4:24:20 PM Problem Short Description : The cover of encoder lamp on A side rotator is damaged and patched with back tape. Action : A permanent repair should be performed. Action Log : Responsible : Mechanics Support Team Deadline : 22 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 13 de May de 1999 4:25:32 PM Problem Short Description : The alarm for power cut is too fast. Action : It should start paging people only if power cut lasts more than 10 seconds. Action Log : Responsible : Infrastructure Support Group Deadline : 30 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 13 de May de 1999 4:27:11 PM Problem Short Description : CCD control software should be updated. Action : It should be done in coordination with FEB99 VLT software installation. Action Log : Responsible : Instrumentation Support Team Deadline : 22 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 14 de May de 1999 6:26:03 PM Problem Short Description : Automatic door closer is needed for NTT bathroom door Action : The door of the NTT bathroom must be closed at all time for an efficient air extraction from the telescope room. Pls install an automatic door closer. Action Log : Responsible : Infrastructure Support Group Deadline : 15 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO NTT Create-date : 14 de May de 1999 6:29:38 PM Problem Short Description : copy of extractor speed selector in ctrl floor Action : We need a additional speed selector for the main air extractor (high speed/low speed). This selector should be located in or near the control room (e.g. on the electric panels in the technical room). Action Log : Responsible : Infrastructure Support Group Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO NTT Create-date : 14 de May de 1999 6:32:47 PM Problem Short Description : air circulator in the NTT fork Action : An air extractor should be installed in the main NTT fork to force air through it, in order to maintain a better temperature uniformity. Action Log : 20 de May de 1999 3:09:00 PM gandreon To be clarified with Mecanics. Responsible : Mechanics Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : ESO 360 Create-date : 17 de December de 1998 1:27:02 PM Problem Short Description : New MOS plates need proper cutting after punching. Action : A suitable cutting device should be manufactured. Action Log : 22 de April de 1999 3:34:59 PM weckert A new dead line has been agreed; End of May. 13 de May de 1999 11:01:30 AM gihle While the final cutter is at the workshop, a special tool to cut the MOS plates was provided. 13 de May de 1999 5:05:55 PM gandreon Considering that urgent needs are covered, the TT accepted a new deadline. Responsible : Mechanics Support Team Deadline : 31 de July de 1999 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 1 de February de 1999 11:56:40 AM Problem Short Description : Autoguider on slit is required urgently for CASPEC. Action : To be enabled. Action Log : 8 de February de 1999 6:49:57 AM jibsen Some modifications has been studied for enableing the feature, but the lack of enough test time made impossible to install it. A technical night is required to complete the task. 18 de February de 1999 1:01:03 PM gandreon To be done during set-up night if not feasible during next week's technical time. Required also for CES fibre. 25 de February de 1999 1:14:17 PM gandreon Test done for the CES fiber. Deadline changed for the Caspec test (it must be mounted). 29 de March de 1999 7:24:21 AM jguzman see related problem report. jibsen 15 de April de 1999 6:01:57 PM weckert Will be done, when CASPEC will be mounted Responsible : Software&Commun.Supp.T. Deadline : 18 de May de 1999 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 18 de February de 1999 12:55:34 PM Problem Short Description : Something may be loose inside CASPEC. Action : It should be opened and checked before next run. Action Log : 25 de February de 1999 10:04:03 AM agilliot Instabilities in Caspec on cross-dispersion has been reported since long time and was a pending problem. The long camera was suspected at that time. The spectrum shift was around 4 or 5 pixels in cross-dispersion for large telescope ZD moves. It was then requested to the astronomer to perform Th calibration for each telescope orientation to monitor the spectrum shift. If the spectrum shift is now larger, something new occured of course and must be investigated. If the shift is about the same values as found in the past then the required work is more important and not justified if the instrument is only requested for one more run before the decomissioning. Alain Gilliotte 11 de March de 1999 9:04:45 AM agilliot Same comments done on Problem report. The caspec should be installed on second floor to check the performances 26 de March de 1999 4:31:40 PM agilliot after an instrument check, we found that effectively something was loose in Caspec !. The Red Cross disperser had its coupling unit loose between the grating and its motor ... justifying the instability Further tests will be done to monitor the flexure and check eventual focus instability. Responsible : Instrumentation Support Team Deadline : 19 de May de 1999 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 25 de February de 1999 1:06:56 PM Problem Short Description : Coude' hole is causing chimney effect in front of main mirror. Action : A permanent, opaque cover should be manufactured to replace the temporary, plastic one now in place. Action Log : 29 de April de 1999 4:26:36 PM gandreon To be mounted after fiber installation. New deadline agreed. Responsible : Mechanics Support Team Deadline : 29 de May de 1999 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 25 de March de 1999 12:51:51 PM Problem Short Description : Guide probe is out of focus when CASPEC is mounted. Action : CASPEC has to be lowered as much as possible without heavy modifications. Spacers (5-7 cm) could be a solution for this last run. Action Log : 25 de May de 1999 8:10:30 AM gihle CASPEC was installed with spacers of 5mm thickness. 27 de May de 1999 4:37:13 PM gandreon Spacers were 4.8 mm hight between adapter and instrument. Responsible : Mechanics Support Team Deadline : 18 de May de 1999 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 8 de April de 1999 5:03:56 PM Problem Short Description : The slit viewer unit is actually at its mechanical limit capacity Action : To study a new slit viewer unit mechanism design Action Log : 22 de April de 1999 4:10:14 PM weckert A proposed new design is almost ready. It will be presented together with an estimation of time and cost requirements. 20 de May de 1999 3:06:55 PM gandreon To be presented to Director. Responsible : Mechanics Support Team Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 8 de April de 1999 5:09:17 PM Problem Short Description : The masks used for spectropolimeter are provisionally installed. Action : A frame for the installation of the spectropolimeter masks has to be provided. Action Log : 15 de April de 1999 6:06:38 PM weckert We got now the drawings and we will try to manufacture the masks untill 09.04.99. 22 de April de 1999 4:12:21 PM weckert The frame will not be necessary, as new masks are fabricated. One mask (out of three) is already delivered. The deadline is May 9th, 1999 6 de May de 1999 11:24:17 AM gihle The last two masks are ready at the workshop. Responsible : Mechanics Support Team Deadline : 30 de April de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 8 de April de 1999 5:11:17 PM Problem Short Description : Some problems have happened in the calibration screen mechanism. Action : A maintenance of the drive mechanism has to be performed. Action Log : 15 de April de 1999 6:03:36 PM weckert Maintenance of the drive will be done during the technical time 22 de April de 1999 4:13:54 PM weckert New deadline due to test time period. Responsible : Mechanics Support Team Deadline : 28 de May de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 8 de April de 1999 5:13:30 PM Problem Short Description : The auxiliary function panel of the 3.6m needs special hinges. Action : To fabricate these hinges Action Log : 5 de May de 1999 1:46:04 PM gihle The hinges are ready at the workshop. Responsible : Mechanics Support Team Deadline : 30 de April de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 22 de April de 1999 4:05:42 PM Problem Short Description : Offset values for EFOSC encoder wheels are difficult to obtain Action : Offset values in the EFOSC have to be set on a set up panel. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 15 de July de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 22 de April de 1999 4:20:48 PM Problem Short Description : The importance of a correct working condition of the fast shutter of SHARP during its observing run. Action : To test the fast shutter of SHARP at the laboratory. Action Log : Responsible : Instrumentation Support Team Deadline : 29 de April de 1999 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 29 de April de 1999 4:29:55 PM Problem Short Description : Nobody knows how to use the straylight detector. Action : A Macchino should teach few Team members on the subject. Action Log : Responsible : Electronics Support Team Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 29 de April de 1999 4:31:45 PM Problem Short Description : Movement sensor and switch are badly located. Action : A sensor at third floor and a switch in the Adonis lab should be moved to more convenient locations. Action Log : Responsible : Infrastructure Support Group Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 29 de April de 1999 4:33:17 PM Problem Short Description : Linearity of CCD #38 has degraded. Action : Degradation should be analyzed and the batch used for test should be adapted to new conditions. Action Log : 20 de May de 1999 3:08:02 PM gandreon The batch has been corrected in order to avoid the saturation. CCD setting has not been touched. Responsible : Instrumentation Support Team Deadline : 20 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 27 de May de 1999 4:44:31 PM Problem Short Description : Sharp shutter could be used in fast mode. Action : A test should be set-up with the spare in order to have a comfirmation before OPC (June 7) Action Log : Responsible : Instrumentation Support Team Deadline : 6 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 11 de March de 1999 9:50:42 AM Problem Short Description : Filter characterization needed. Action : WFI filters should be introduced in the ESO filter database. Action Log : 15 de April de 1999 6:04:51 PM weckert Will be done by Alain Gilliotte during next week. 26 de April de 1999 4:21:17 PM agilliot Filters WFI measured and introduced on the ESO Midas database. some of the filters have red leaks . pls check before using it Responsible : Instrumentation Support Team Deadline : 29 de April de 1999 10:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 15 de April de 1999 9:45:51 PM Problem Short Description : D1p54 and E2p2 Environment sensor systems need finishing. Action : The temperature and humidity sensor systems at the D1p54 and E2p2M telescopes which were installed by Manfred Mornhinweg should be completed. Some sensors give bad readings, while some are not properly mounted (good thermal contact is needed). Action Log : 27 de May de 1999 4:38:57 PM gandreon M2 sensor positioning under study. Other sensors have been installed. Responsible : Electronics Support Team Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 16 de April de 1999 7:49:58 PM Problem Short Description : Support required for visitor instrument. Action : Support needed on June 20th to dismount WFI, mount visitor instrument and balance telescope. Support also required on June 25 to dismount visitor instrument and remount WFI. Action Log : Responsible : Mechanics Support Team Deadline : 25 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 6 de May de 1999 2:54:23 PM Problem Short Description : Supports are needed for interlock visualization panel. Action : They should be manufactured. Action Log : 11 de May de 1999 1:58:52 PM gihle All pieces are ready at the workshop. Responsible : Mechanics Support Team Deadline : 15 de May de 1999 12:00:00 AM Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 27 de May de 1999 4:43:02 PM Problem Short Description : Indipendent cooler needed for Fiera & Co. Action : The spare unit of the 360 will be completed and installed. MET will pay for the new spare subsystems. Action Log : Responsible : Mechanics Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : DAN 154 Create-date : 3 de October de 1998 7:38:17 PM Problem Short Description : Adaptor VME exhaust vents near mirror cell... Action : An exhaust extraction hood, tube and fan should be installed. The design should be similar to that of the Dutch telescope, i.e. a `chimney' is required in the hood in case of extraction fan failure. Action Log : 8 de October de 1998 2:25:11 PM gandreon To be approved by LSO Director. 30 de December de 1998 12:49:32 PM gandreon Quotation from Mechanics is pending. 7 de January de 1999 12:55:06 PM gandreon Quotation from mechanics is urgent. 25 de January de 1999 11:36:27 AM gandreon Quotation is one week man. 4 de March de 1999 8:57:55 AM gandreon Decision from Director is expected. 25 de March de 1999 12:57:44 PM gandreon Director said it should be done. Responsible : Mechanics Support Team Deadline : 29 de April de 1999 10:00:00 PM Deadline Status : Overdue ________________________________________________________________________________ Telescope : DAN 154 Create-date : 21 de November de 1998 2:22:41 PM Problem Short Description : Safe ladder access to rotating part of the dome, working platform at dome top Action : (1) A safe access (ladder with cage) should be installed from the catwalk to the rotating part of the dome. (2) A working platform at the top of the dome is needed. Action Log : 25 de November de 1998 7:17:26 AM fluco The point Ner 1 was complete , and the point Ner 2 should be reassigned to mechanical team. They should build this platform. 11 de February de 1999 1:00:39 PM gandreon A structural check should be performed on the fiberglass dome before proceding. Some cracks have been observed. 1 de April de 1999 12:51:23 PM gandreon Reassigned to mechanics (it was assigned to ISG). Responsible : Mechanics Support Team Deadline : 30 de April de 1999 12:00:00 AM Deadline Status : Overdue ________________________________________________________________________________ Telescope : DAN 154 Create-date : 1 de April de 1999 12:45:29 PM Problem Short Description : Old workstation should be replaced. Action : The WS previously used at Dutch has to be configured with new HP-UX and VLT Panel Editor (no RTAP). Action Log : Responsible : Software&Commun.Supp.T. Deadline : 14 de June de 1999 10:00:00 PM Deadline Status : Pending ________________________________________________________________________________ Telescope : DAN 154 Create-date : 6 de May de 1999 2:53:30 PM Problem Short Description : After recent works, cables are messy. Action : They should be put in order (two days work). Action Log : Responsible : Electronics Support Team Deadline : 31 de May de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : 25 de February de 1999 1:04:56 PM Problem Short Description : Alpha counterweight gets stuck from time to time. Action : An overhaul is needed. Action Log : 5 de May de 1999 12:24:43 PM gihle The alpha counterweight was checked, but the first tests were not succesful regarding the cause of the problem. In order to have an answer to the problem, it is necessary to dismount the counterweight unit. This operation will need one observing night test time. It is necessary to define a date when this is possible. 27 de May de 1999 4:41:14 PM gandreon Date has been agreed. Responsible : Mechanics Support Team Deadline : 6 de June de 1999 12:00:00 AM Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : 20 de May de 1999 3:01:48 PM Problem Short Description : At the exit of FEROS calibration UNIT, there is a fiber which has to be protected. Action : A permanent protection should be manufactured. Action Log : Responsible : Mechanics Support Team Deadline : Deadline Status : Not Assigned ________________________________________________________________________________ Telescope : GENERAL Create-date : 22 de April de 1999 4:24:15 PM Problem Short Description : An observing run with HEROS at the 50cm ESO telescope Action : To provide support for the HEROS mounting in the telescope plus the provision of LN2 Action Log : 3 de May de 1999 3:21:30 PM gihle The instrument was installed and the telescope balanced. LN2 was provided. Responsible : Mechanics Support Team Deadline : 28 de April de 1999 11:00:00 PM Deadline Status : Closed on Time ________________________________________________________________________________