Generated by ARS on 07/09/97 09:42:52 ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC Telescope : ESO NTT Create-date : 09/04/96 20:00:00 Problem Short Description : COVER FOR TRANSPORT OF PRIMARY MIRROR TO COATING PLANT IS INADEQUATE Action : Either it will be modified or a new one has to be manufactured before next aluminization. Action Log : 07/05/97 11:06:00 jdiaz Test by GAN 07/05/97 11:33:24 gihle The design for the modification of the mirror cover is ready and in the workshop. 07/05/97 11:37:49 gihle This is just a test for GAE Responsible : Mechanics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO NTT Create-date : 07/05/97 09:37:16 Problem Short Description : Tool to mount echelle gratings Action : A new tool should be made to mount the echelle gratings without removing the ACE box. Action Log : Responsible : Mechanics Support Team Deadline : 07/15/97 00:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 04/28/97 20:00:00 Problem Short Description : ADONIS COVER NEEDS FIXATIONS Action : magnetic fixations should be added. Action Log : Responsible : Mechanics Support Team Deadline : 08/31/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 04/28/97 20:00:00 Problem Short Description : VIBRATIONS ARE DETECTED WITH CES Action : The power spectrum should be measured in order to identify sources. Accelerometers should be used to find where there is a shortcut between building and COUDE' platform. Action Log : 07/01/97 17:54:34 gandreon The isntrument is now in place. Pervliminary investigations show that ther are a number of possible sources that now should be checked one by one by the telescope team. Responsible : Optics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 06/24/97 15:26:36 Problem Short Description : INTEGRATING SPHERE NEEDED FOR ADONIS Action : It has to be mounted, aligned, and tested. If possible, before next Adonis run. Action Log : Responsible : Optics Support Team Deadline : 07/30/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 07/09/97 09:27:06 Problem Short Description : FABRY-PEROT REQUIRES MODIFICATIONS Action : Modifications have to be carried out according to requirements verbally given. Action Log : Responsible : Mechanics Support Team Deadline : 08/18/97 00:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 07/09/97 09:29:02 Problem Short Description : TESTS ARE REQUIRED FOR THE DESIGN OF THE NEW SERVO CONTROL Action : A test servo drive has to be prepared. Action Log : Responsible : Mechanics Support Team Deadline : 07/15/97 00:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : 05/12/97 20:00:00 Problem Short Description : ECHELEC SHOULD BE REMOVED FROM COUDE' ROOM Action : To be done. Action Log : Responsible : Optics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Overdue ________________________________________________________________________________ Telescope : ESO 152 Create-date : 06/24/97 15:28:14 Problem Short Description : RANDOM OVERCURRENTS CAUSED THE ALPHA AMPLIFIER TO SWITCH OFF Action : The alpha roller mechanism should be checked. Action Log : Responsible : Mechanics Support Team Deadline : 07/14/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : DUTCH Create-date : 03/16/97 20:00:00 Problem Short Description : IMAGE TRANSMISSION FAILS ONCE IN A WHILE Action : Eduardo should provide the TT with instructions for the monitoring and troubleshooting of the problem. The same happens at the Danish. Action Log : 07/09/97 09:35:13 gandreon Eduardo Robledo installed a program to control and monitoring the problem. Thomas asked for a week to check the functioning of this program. He will inform next week the results. Responsible : Software&Commun.Supp.T. Deadline : 03/29/97 20:00:00 Deadline Status : Overdue ________________________________________________________________________________ Telescope : GENERAL Create-date : 03/09/97 20:00:00 Problem Short Description : PLASTIC HOSES IN GLYCOL MANUAL PUMPS SHOULD BE REPLACED Action : a permanent installation should be done at 2.20 and 3.60. Action Log : Responsible : Mechanics Support Team Deadline : 09/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 05/26/97 20:00:00 Problem Short Description : THE PROJECTOR IN THE THEATRE SHOULD BE MADE ACCESSIBLE TO A PC FOR PRESENTATIONS. Action : A permanent installation should be set-up. It will permit to display standard VGA format from a PC on the stage. Action Log : 07/09/97 09:37:12 gandreon It was installed, but it has to be tested and checked. The cabling also has to be permanently installed. Responsible : Electronics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Overdue ________________________________________________________________________________ Telescope : GENERAL Create-date : 06/10/97 20:00:00 Problem Short Description : CORRUPTED DLT TAPE WAS UNDETECTED Action : A suitable procedure (like old rlist) should be prepared and distributed. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 07/14/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 06/24/97 15:30:31 Problem Short Description : ENVIRONMENTAL CONDITIONS IN CONTROL ROOMS ARE INADEQUATE FOR DATA SAVING (TOO DRY) Action : Suitable humidifiers should be purchased and installed where they are still missing. SWC will provide list of control rooms. Action Log : Responsible : Mechanics Support Team Deadline : 08/30/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________