Generated by ARS on 06/25/97 09:23:37 ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC Telescope : ESO NTT Create-date : 09/04/96 20:00:00 Problem Short Description : COVER FOR TRANSPORT OF PRIMARY MIRROR TO COATING PLANT IS INADEQUATE Action : Either it will be modified or a new one has to be manufactured before next aluminization. Action Log : Responsible : Mechanics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 04/28/97 20:00:00 Problem Short Description : ADONIS COVER NEEDS FIXATIONS Action : magnetic fixations should be added. Action Log : Responsible : Mechanics Support Team Deadline : 08/31/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 04/28/97 20:00:00 Problem Short Description : VIBRATIONS ARE DETECTED WITH CES Action : The power spectrum should be measured in order to identify sources. Accelerometers should be used to find where there is a shortcut between building and COUDE' platform. Action Log : Responsible : Optics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 360 Create-date : 04/28/97 20:00:00 Problem Short Description : Support for VME used in Direct Imaging is required. Action : Action Log : Responsible : Mechanics Support Team Deadline : 06/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 05/19/97 20:00:00 Problem Short Description : Prepare lamp holder for connection to a fiber Action : Action Log : Responsible : Mechanics Support Team Deadline : 06/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 05/26/97 20:00:00 Problem Short Description : Prepare mirror disk for ADOCAM OS/9 VME Action : Action Log : Responsible : Infrared Support Team Deadline : 06/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 05/26/97 20:00:00 Problem Short Description : FAILURES IN AIR CONDITIONING CAN GO UNDETECTED Action : Alarm should be sent to a specific pager when a failure is detected. Action Log : Responsible : Infrastructure Support Group Deadline : 07/30/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 360 Create-date : 06/24/97 15:26:36 Problem Short Description : INTEGRATING SPHERE NEEDED FOR ADONIS Action : It has to be mounted, aligned, and tested. If possible, before next Adonis run. Action Log : Responsible : Optics Support Team Deadline : 07/30/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO/MPI 220 Create-date : 06/10/97 20:00:00 Problem Short Description : AUTO-GUIDER CANNOT BE FULLY TESTED DURING DAYTIME Action : A filter holder for DISCO for the mounting of a suitable filter has been prepared but the filter is not available (installed at 360). Action Log : Responsible : Mechanics Support Team Deadline : 06/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DAN 154 Create-date : 05/26/97 20:00:00 Problem Short Description : SOME KEYWORDS ARE STILL INCORRECT IN FITS HEADER Action : Daisy has been modified. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 07/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DAN 154 Create-date : 06/03/97 20:00:00 Problem Short Description : Adapt DIMM 4 support to Danish 154 (Seeing measurement campaign) Action : Action Log : Responsible : Mechanics Support Team Deadline : 06/14/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : DAN 154 Create-date : 06/10/97 20:00:00 Problem Short Description : Install duct for mirror cooling air flow Action : Action Log : Responsible : Mechanics Support Team Deadline : 06/09/97 20:00:00 Deadline Status : Closed on Time ________________________________________________________________________________ Telescope : ESO 152 Create-date : 05/12/97 20:00:00 Problem Short Description : ECHELEC SHOULD BE REMOVED FROM COUDE' ROOM Action : To be done. Action Log : Responsible : Optics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : ESO 152 Create-date : 05/12/97 20:00:00 Problem Short Description : FORMULA FOR SLIT SIZE DOES NOT INCLUDE OFFSET Action : The zero point has been added in the control program by Flavio. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 05/29/97 20:00:00 Deadline Status : Closed with Delay ________________________________________________________________________________ Telescope : ESO 152 Create-date : 06/24/97 15:28:14 Problem Short Description : RANDOM OVERCURRENTS CAUSED THE ALPHA AMPLIFIER TO SWITCH OFF Action : The alpha roller mechanism should be checked. Action Log : Responsible : Mechanics Support Team Deadline : 07/14/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : DUTCH Create-date : 03/16/97 20:00:00 Problem Short Description : IMAGE TRANSMISSION FAILS ONCE IN A WHILE Action : Eduardo should provide the TT with instructions for the monitoring and troubleshooting of the problem. The same happens at the Danish. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 03/29/97 20:00:00 Deadline Status : Overdue ________________________________________________________________________________ Telescope : GENERAL Create-date : 03/09/97 20:00:00 Problem Short Description : PLASTIC HOSES IN GLYCOL MANUAL PUMPS SHOULD BE REPLACED Action : a permanent installation should be done at 2.20 and 3.60. Action Log : Responsible : Mechanics Support Team Deadline : 09/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 05/26/97 20:00:00 Problem Short Description : THE PROJECTOR IN THE THEATRE SHOULD BE MADE ACCESSIBLE TO A PC FOR PRESENTATIONS. Action : A permanent installation should be set-up. It will permit to display standard VGA format from a PC on the stage. Action Log : Responsible : Electronics Support Team Deadline : 06/29/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 06/10/97 20:00:00 Problem Short Description : CORRUPTED DLT TAPE WAS UNDETECTED Action : A suitable procedure (like old rlist) should be prepared and distributed. Action Log : Responsible : Software&Commun.Supp.T. Deadline : 07/14/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________ Telescope : GENERAL Create-date : 06/24/97 15:30:31 Problem Short Description : ENVIRONMENTAL CONDITIONS IN CONTROL ROOMS ARE INADEQUATE FOR DATA SAVING (TOO DRY) Action : Suitable humidifiers should be purchased and installed where they are still missing. SWC will provide list of control rooms. Action Log : Responsible : Mechanics Support Team Deadline : 08/30/97 20:00:00 Deadline Status : Pending ________________________________________________________________________________