ACTION ITEMS LIST FOR SUPPORT TEAMS AND LOGISTIC ------------------------------------------------ Week 18/97: April 30 - May 6, 1997 --------------------------------------- Attendance: R Gredel, S Benetti, J Storm, L Aguila, G Lundqvist, B Reipurth, W Eckert, A Gilliotte, U Weilenmann, G Andreoni, R Medina, R Parra, N Haddad, M Shetrone. A. NTT T 96.35.01 COVER FOR TRANSPORT OF PRIMARY MIRROR TO COATING PLANT IS INADEQUATE ACTION: Either it will be modified or a new one has to be manufactured before next aluminization. Responsible: G Ihle Deadline: June 97 T 97.10.01 WASHING OF PRIMARY MIRROR NEEDS TO BE PREPARED Action: Few pieces have been machined. One N2 bottle should be made available. Responsible: G Ihle Deadline: May 20 (Washing is planned on 21) T 97.10.02 ENCODER LAMP WILL BE REPLACED ON RB AND AZ Action: support from mechanics is required to carry out the operation. Responsible: G Ihle Deadline: Period 13-20 May. I 97.10.03 WATER IS REQUIRED FOR MIRROR WASHING Action: A temporary installation should be provided at the telescope floor. Responsible: L Aguila Deadline: May 20 T 97.18.01 PLATE FOR EMMI ALIGNMENT IS REQUIRED Action: the plate, with some 18 holes 60 microns each, has been delivered. Responsible: G Ihle Deadline: May 5 CLOSED 97.18 B. 3.6 T 96.12.01 ADONIS INSTALLATION IN CASSEGRAIN NEEDS IMPROVEMENTS ACTION: The interconnection between the two racks and the optical bench should be rewired. Ruggedized connectors should be ordered and installed (possibly VLT compliant). Responsible: M Maugis Deadline (new): end of June 97(after reformulation of the point) T 97.12.02 SHELL SCRIPT NEEDED TO RUN IDL INTERFACE FOR TIMMY Action: it should be written under guidance of IR team. Responsible: G Lundqvist Deadline: End of June T 97.17.01 VIBRATIONS ARE DETECTED WITH CES Action: The power spectrum should be measured in order to identify sources. Accelerometers should be used to find where there is a shortcut between building and coude' platform. Responsible: A Gilliotte Deadline: TBD (after May) T 97.17.02 F80 TELESCOPE IN ADONIS NEEDS ADJUSTMENT DEVICE Action: a simple device (as a screw without micrometer) should be added. Responsible: G Ihle Deadline: May 10 T 97.17.03 SUPPORT IS NEEDED FOR THE VME USED BY DIRECT IMAGING Action: a suitable plate should be prepared. Responsible: G Ihle Deadline: End of June T 97.17.04 ADONIS COVER NEEDS FIXATIONS Action: magnetic fixations should be added. Responsible: W Eckert Deadline: September 1 F. CAT/CES T 97.18.01 ANOTHER IRS COPY IS NEEDED FOR CONCURRENT INSTRUMENT TEST Action: it should be installed. Responsible: G Lundqvist Deadline: TBD after feasibility study C. 2.2m T 97.15.01 NEW BATCH NEEDED FOR IRAC I Action: To be adapted from existing one. Responsible: G Lundqvist Deadline: End of May. D. D1.5m T 97.14.01 BIAS PROGRAM FOR NEW CCD HAS DIFFERENT INTERFACE Action: Daisy should be modified in order to permit increased read-out mode. Responsible: G Lundqvist Deadline: Mid May E. E1.5m G. 1m H. 0.9m Dutch T 97.11.01 IMAGE TRANSMISSION FAILS ONCE IN A WHILE Action: Eduardo should provide the TT with instructions for the monitoring and troubleshooting of the problem. The same happens at the Danish. Responsible: G Lundqvist Deadline: End of March. I. 0.5m ESO J. 0.5m Danish K. Schmidt L. SEEING Monitor M. MIDAS N. SEST T 97.17.01 THE FRONT PANEL FOR THE TCS IS NEEDED Action: it has been machined. Responsible: G Ihle Deadline: May 9. CLOSED 97.18 O. MARLY EROS2 (formerly GPO) W. CCD detectors. Z. General. T 97.10.01 PLASTIC HOSES IN GLYCOL MANUAL PUMPS SHOULD BE REPLACED Action: a permanent installation should be done at 2.20 and 3.60. Responsible: G Ihle (CHANGED) Deadline: End of September ACTION POINT STATISTICS YEAR 1997: Opened Closed Total Pending Opened Week 1/97 4 1 1 17 Week 2 7 3 8 21 Week 3 1 3 9 19 Week 4 1 2 10 18 Week 5 0 0 10 18 Week 6 1 2 11 17 Week 7 0 5 11 12 Week 8 1 0 12 13 Week 9 4 6 16 11 Week 10 4 1 20 14 Week 11 3 0 23 17 Week 12 7 0 30 24 Week 13 0 4 30 20 Week 14 2 1 32 21 Week 15 2 5 34 18 Week 16 0 3 34 15 Week 17 5 5 39 15 Week 18 2 2 41 15