![[ ESO ]](/images/eso-logo.gif) |
 |
WFI Grism Mounting
Procedure
|
|
|
Grism Mounting Procedure duration: Aprox. 60 minutes
For this delicate operation you need an experienced TIO
(1) Call the mechanics,
they will dismount the WFI with tools stored in the fiber room(Integration Room).
-
Put Amplifiers and the Hydraulic pumps ON.
-
Reboot the TCS VME.
-
Start Up the TCS.
-
Put the telescope in the Zenith position. Use the TCS GUI.
(2) In the Dome:
-
Follow up the Safety instruction for working the Dome Area. Don't forget your Helmet and your safety shoes.
-
Put the telescope lock pins IN
-
Let the mechanic team remove all the screws from
WFI chassis.
-
Remove the nitrogen gas hose. No others cables or hoses must be disconnected.
-
The WFI must be mount over the carriage and attach to it (take care with cables and fibers).
-
Take out the Grism Unit from the storage room, call for help it is necessary.
-
Be sure that the protective shutter is close.
-
Take care with your fingers, don't talk or smoke over the Grism surface.
-
Put the Grism Unit directly over the central axis of the instrument.
-
Be sure that the aligment of the grism is Ok (see if the marks are colineal).
-
Put all the Grism screws around the flange.
-
Lift the instrument and reinstall the screws that connect the instrument
to the telescope.
-
Disconnect the carriage from the instrument.
-
Now the Grism is installed in the instrument.
-
No telescope balance or other adjustment it is necessary.
-
Put the telescope lock pins OUT
-
Remove all the objects or carriages around the telescope.
-
Store the special tools in the fiber room (Integration Room). (No other tools or spare are available)