[ ESO ] La Silla

WFI Technical
Instructions


Description

These pages concern the operation of the WFI, and are mainly of interest to 2p2 Team members.


[*] The w2p2ins and w2p2drs utility program archive.
[*] checklist for support astronomers.
[*] Operational Procedures
[*] Start Up and Troubleshooting
[*] How to run the Daily Health Check
[*] How to run the Weekly Health Check
[*] Operations Checklist (postscript file)
[*] Backups and Efficiency Program
[*] Dewar refilling
[*] Telescope Start-Up
[*] Telescope Shut-Down
[*] How to recover the telescope from an interlock
[*] FIERA reboot procedure
[*] Re-Booting the MPG/ESO 2.2m Workstations
[*] WFI Mounting Procedure
[*] WFI Dismounting Procedure
[*] Grism installation
[*] Checking the Telescope Balance
[*] Zero Pointing The 2p2 Telescope
[*] Differential Guiding Procedure
[*] WFI Filter Configuration Log
[*] NGAS Disks Handling Procedure
[*] NGAS Tools

[*] WFI Related Documents
[*] A description of DAISY+'s functionality
[*] Commissioning the updated 2p2 TCS (Dated: 11 February 2000)
[*] DAISY+ Version 1.0: Commissioning Plan (Dated: 6 June 2000)
[*] DAISY+ Version 1.0: Commissioning Report (Dated: 5 July 2000)
[*] WFI Templates Reference Manual (Dated: 4 July 2000)
[*] BOB@WFI Commissioning Plan (Dated: 7 June 2000)

[*] Miscellanea
[*] LN2 Log-Sheet (6K PostScript)
[*] Blank Password Memo
[*] Pointing Model Instructions
[*] Description of the N2 flusing system



Observing [ESO La Silla]  [Back to the 2p2 Home Page]  [ESO]  [Index]  [Search]  [Help]  [News]